Laserfiche WebLink
3.2. - Relevant Experience <br />Burkhart Sign Systems collaborates in wayfinding programs continually. We refer to them as <br />"Campus Sign Programs" implying a design is to be followed giving identity to the organization's <br />property. We recently completed a 2-year project for Notre Dame surveying, removing and <br />installing approximately 2200 signs! This project started as the "Campus Crossroads' initiative <br />and went to a Phase I with Phase 2 being the 2200 informational, directional and street signs. <br />The organization and execution of this project was very intensive considering utility notifications, <br />the hydro-vacing (winter conditions) and the pouring of concrete foundations for every sign. <br />We are presently working with Marian High School, Hubble in the Ameriplex Complex, <br />continuing work with the Parkview Trail System (noted here in 3.4), as well as continuing <br />directional work with General Motors in Ft. Wayne where every GM pick-up truck on the road <br />is produced. Being a union shop we are the exclusive sign company for GM. All of these projects <br />are executed with a site plan, sometimes a Google overhead, and collaborating with the client for <br />effective directional signage. <br />We have chosen a Campus Sign Program for the Center For Hospice in Mishawaka as an example <br />for this proposal.. This project is similar in area to Howard Park with the challenges being mail <br />delivery to (3) addresses, a one-way exit to Cedar Street, the need to use the right-of-way, both <br />entrances being shared with Central Park and beautiful building architecture that the signs need <br />to enhance and not interfere. This project was a collaboration between the Director (referenced <br />in this proposal), JPR as the civil architects, DJ Construction as the contractor, and Jeff Lowry as the <br />building architect. As well as similar property area; this project is a good blueprint for the successful <br />execution of the Howard Park project. <br />Again, this proposal exceeds the 2-page limit so the site -plan is shown below. <br />one `x" <br />Z� <br />-Paso4, <br />9=20 <br />