Project Name:
<br />Project Number:
<br />For Bids Due:
<br />Contractor Name:
<br />BID/PROPOSAL �0°r
<br />CITY OF SUTH
<br />56
<br />Michigan Street Reconst O t onWBEND PRAM,
<br />118-075
<br />� ......._ _........................................ _......................
<br />__
<br />May 14, 2019
<br />-ITRieth-RiWj_Constructm onmCo..,.minc....._................................
<br />26
<br />27
<br />28
<br />29
<br />30
<br />31
<br />32
<br />33
<br />DI WATER MAIN, 61N
<br />........._............-._......................
<br />REMOVE AND RESET FIRE HYDRANT
<br />PARTIAL DEPTH CONCRETE GUTTER
<br />SURFACE REPLACEMENT
<br />HMA PATCHING, TYPE B, UNDISTRIBUTED
<br />COMPACTED AGGREGATE, NO. 53
<br />HMA BASE, TYPE B
<br />HMA INTERMEDIATE, TYPE_B...........................................................12
<br />HMA SURFACE, TYPE B
<br />31
<br />.....................
<br />1
<br />400
<br />80
<br />2560
<br />36
<br />52
<br />LFT
<br />...._..__.
<br />EACH
<br />LFT
<br />TON
<br />TON
<br />TO
<br />TON
<br />TON
<br />$........................150.00
<br />$ 5,000.00
<br />$ 112.00
<br />$ 225.00
<br />$ 28.45
<br />$ 210.00
<br />$ 300.00
<br />$ 250.00
<br />$ 4,650.00
<br />$ 5,000.00
<br />$ 44,800.00
<br />$ 18,000.00
<br />$ 72,8 22.00
<br />$ 7,560.00
<br />$__. 3,60"..�...._.
<br />0.00
<br />----........��......... __............ ��
<br />$ 13,000.00
<br />34
<br />PCCP FOR APPROACHES, 9 IN REINFORCED,
<br />68
<br />SYS
<br />.._....
<br />$ 230.00
<br />_....__........................ ............1-
<br />$ 15,640.00
<br />HIGH -EARLY
<br />35
<br />PCCP, REINFORCED, PLAIN, 101N
<br />6150
<br />SYS
<br />I $ 78.00
<br />Is 479,700.00
<br />36 ..
<br />PCCP, REINFORCED, HIGH -EARLY, 10 IN
<br />215
<br />SYS _
<br />$ 110.00
<br />$ 23,650.00
<br />37
<br />PCCP, REINFORCED, COLORED, 101N
<br />850
<br />SYS
<br />$ 107.00
<br />$ 90,950.00
<br />38
<br />CURB & GUTTER, CONCRETE
<br />605
<br />LFT
<br />$ 100.00
<br />$ 60,500.00
<br />39
<br />SIDEWALK, CONCRETE, 51N
<br />1865
<br />SYS
<br />$ 58.00
<br />_......... ___..............-............
<br />$ 108,170.00
<br />40
<br />PCCP, HEADER, 10 IN
<br />1135
<br />LFT
<br />$ 48.00
<br />$ 54,480.00
<br />41IT._...�
<br />CUmRBmmmRAMP,mmCON CRETE IT_.�........_......_�_...._.._._..�_._.._._._._._.
<br />_._..128mm
<br />SYS.
<br />$ __....................
<br />200.00
<br />$ 25,600.00
<br />42
<br />_. _....... ...__.._...._ ... CLEAN .............& . _.. RESEAL ...................
<br />SIDEWALK JOINTS,
<br />1 _
<br />LS
<br />$ 5,565.00
<br />$ 5,565.00
<br />43
<br />THERMOPLASTIC STOP LINE, WHITE, 24 IN.
<br />215
<br />LFT
<br />$ 5.95
<br />$ m1,279 25
<br />44
<br />THERMOPLASTIC LINE, SOLID, WHITE, 4 IN.
<br />280
<br />LFT
<br />$ 2.25ITITITITITITIT
<br />$ITITITmmmmmmmmmmmmmmmmWWWWWWWWWWWWWWWWWW__- 630.00
<br />_._
<br />45
<br />...-.M........................................................_......_........._.�._.�._
<br />THERMOPLASTIC LINE, SOLID, YELLOW, 41N.
<br />_.......................................................................
<br />2.
<br />LFT
<br />$ 2.25
<br />$ 576.00
<br />46
<br />PAVEMENT MESSAGE MARKING,
<br />4
<br />EACH
<br />$ 120.00
<br />$ 480.00
<br />THERMOPLASTIC
<br />47
<br />EPDXY LINE, STOP LINE, WHITE, 24 IN,
<br />123
<br />LFT
<br />$ 7.95
<br />$ 977.85
<br />48
<br />.
<br />EXY LINE, SOLID, WHITE, 41N.
<br />PO
<br />3590
<br />LFT
<br />. _ .
<br />$ 0.72
<br />is 2,584.80
<br />49
<br />........ .__......__........ __..... _�...............................
<br />EPDXY LINE, SOLID, YELLOW, 41N.
<br />......................._
<br />3720
<br />........
<br />LFT
<br />..........
<br />$ 0.72
<br />$ 2,678.40
<br />50
<br />EPDXY, HATCH LINE, YELLOW
<br />810
<br />LFT
<br />$ 0.72
<br />$ 583.20
<br />51
<br />.............................................................................................. _ WWWWWWWWWWWWWWWW
<br />EPDXY, HATCH LINE, BLUE
<br />_.....................
<br />640
<br />WWWWWWWWWWW
<br />LFT
<br />$ 1.02
<br />$ 652.80
<br />Version 7/20/2018 Contractor's Bid for Public Works - 8
<br />
|