Laserfiche WebLink
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />BID/PROPOSAL �0°r <br />CITY OF SUTH <br />56 <br />Michigan Street Reconst O t onWBEND PRAM, <br />118-075 <br />� ......._ _........................................ _...................... <br />__ <br />May 14, 2019 <br />-ITRieth-RiWj_Constructm onmCo..,.minc....._................................ <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />DI WATER MAIN, 61N <br />........._............-._...................... <br />REMOVE AND RESET FIRE HYDRANT <br />PARTIAL DEPTH CONCRETE GUTTER <br />SURFACE REPLACEMENT <br />HMA PATCHING, TYPE B, UNDISTRIBUTED <br />COMPACTED AGGREGATE, NO. 53 <br />HMA BASE, TYPE B <br />HMA INTERMEDIATE, TYPE_B...........................................................12 <br />HMA SURFACE, TYPE B <br />31 <br />..................... <br />1 <br />400 <br />80 <br />2560 <br />36 <br />52 <br />LFT <br />...._..__. <br />EACH <br />LFT <br />TON <br />TON <br />TO <br />TON <br />TON <br />$........................150.00 <br />$ 5,000.00 <br />$ 112.00 <br />$ 225.00 <br />$ 28.45 <br />$ 210.00 <br />$ 300.00 <br />$ 250.00 <br />$ 4,650.00 <br />$ 5,000.00 <br />$ 44,800.00 <br />$ 18,000.00 <br />$ 72,8 22.00 <br />$ 7,560.00 <br />$__. 3,60"..�...._. <br />0.00 <br />----........��......... __............ �� <br />$ 13,000.00 <br />34 <br />PCCP FOR APPROACHES, 9 IN REINFORCED, <br />68 <br />SYS <br />.._.... <br />$ 230.00 <br />_­....__........................ ............1- <br />$ 15,640.00 <br />HIGH -EARLY <br />35 <br />PCCP, REINFORCED, PLAIN, 101N <br />6150 <br />SYS <br />I $ 78.00 <br />Is 479,700.00 <br />36 .. <br />PCCP, REINFORCED, HIGH -EARLY, 10 IN <br />215 <br />SYS _ <br />$ 110.00 <br />$ 23,650.00 <br />37 <br />PCCP, REINFORCED, COLORED, 101N <br />850 <br />SYS <br />$ 107.00 <br />$ 90,950.00 <br />38 <br />CURB & GUTTER, CONCRETE <br />605 <br />LFT <br />$ 100.00 <br />$ 60,500.00 <br />39 <br />SIDEWALK, CONCRETE, 51N <br />1865 <br />SYS <br />$ 58.00 <br />_......... ___..............-............ <br />$ 108,170.00 <br />40 <br />PCCP, HEADER, 10 IN <br />1135 <br />LFT <br />$ 48.00 <br />$ 54,480.00 <br />41IT._...� <br />CUmRBmmmRAMP,mmCON CRETE IT_.�........_......_�_...._.._._..�_._.._._._._._. <br />_._..128mm <br />SYS. <br />$ __.................... <br />200.00 <br />$ 25,600.00 <br />42 <br />_. _....... ...__.._...._ ... CLEAN .............& . _.. RESEAL ................... <br />SIDEWALK JOINTS, <br />1 _ <br />LS <br />$ 5,565.00 <br />$ 5,565.00 <br />43 <br />THERMOPLASTIC STOP LINE, WHITE, 24 IN. <br />215 <br />LFT <br />$ 5.95 <br />$ m1,279 25 <br />44 <br />THERMOPLASTIC LINE, SOLID, WHITE, 4 IN. <br />280 <br />LFT <br />$ 2.25ITITITITITITIT <br />$ITITITmmmmmmmmmmmmmmmmWWWWWWWWWWWWWWWWWW__- 630.00 <br />_._ <br />45 <br />...-.M........................................................_......_........._.�._.�._ <br />THERMOPLASTIC LINE, SOLID, YELLOW, 41N. <br />_....................................................................... <br />2. <br />LFT <br />$ 2.25 <br />$ 576.00 <br />46 <br />PAVEMENT MESSAGE MARKING, <br />4 <br />EACH <br />$ 120.00 <br />$ 480.00 <br />THERMOPLASTIC <br />47 <br />EPDXY LINE, STOP LINE, WHITE, 24 IN, <br />123 <br />LFT <br />$ 7.95 <br />$ 977.85 <br />48 <br />. <br />EXY LINE, SOLID, WHITE, 41N. <br />PO <br />3590 <br />LFT <br />. _ . <br />$ 0.72 <br />is 2,584.80 <br />49 <br />........ .__......__........ __..... _�............................... <br />EPDXY LINE, SOLID, YELLOW, 41N. <br />......................._ <br />3720 <br />........ <br />LFT <br />.......... <br />$ 0.72 <br />$ 2,678.40 <br />50 <br />EPDXY, HATCH LINE, YELLOW <br />810 <br />LFT <br />$ 0.72 <br />$ 583.20 <br />51 <br />.............................................................................................. _ WWWWWWWWWWWWWWWW <br />EPDXY, HATCH LINE, BLUE <br />_..................... <br />640 <br />WWWWWWWWWWW <br />LFT <br />$ 1.02 <br />$ 652.80 <br />Version 7/20/2018 Contractor's Bid for Public Works - 8 <br />