BID/PROPOSAL�iw
<br />CITY OF
<br />SOUTH
<br />BEND
<br />Project Name: Michigan Street Reconstruction
<br />Project Number: 118-075
<br />.
<br />.......
<br />_.....
<br />For Bids Due: May 14, 2019
<br />Rieth.F ile Construction
<br />Contractor Name: '
<br />Co.'," —In'
<br />c..........
<br />_..
<br />No .:............._.........
<br />_. Description
<br />CITY
<br />UNIT
<br />UNIT PRICE ..._._
<br />..........
<br />AMOUNT
<br />1
<br />................. .._.
<br />MOBILIZATION AND DEMOBILIZATION
<br />1
<br />_.� ...
<br />LS
<br />$ 234, 306.55
<br />$ 234,306.55
<br />2
<br />.......................
<br />MAINTAINING TRAFFIC
<br />_.... .....__ ._....W
<br />1
<br />LS
<br />_ ...
<br />$ 50,000.00
<br />$ 50,000.00
<br />3
<br />CONSTRUCTION _..n_..
<br />ENGINEERING
<br />1
<br />LS
<br />$ 40,000.00
<br />$ 40,000.00
<br />4
<br />......._ . ...............
<br />CPMmSCHEDULE
<br />_
<br />1
<br />LS
<br />... _........... w_ww
<br />$ 2,000.00
<br />....-........... ....a
<br />$ 2,000.00
<br />5 ....
<br />CPMmSCHEDULE, MONTHLY UPDAit ...........
<br />4
<br />EACH
<br />$ 25.00
<br />$ 100.00
<br />...............
<br />6
<br />VIDEO RECORD
<br />1
<br />-LS
<br />�.�.....
<br />$ 7,500.00
<br />$ 7,500 .00
<br />7
<br />CLEARING RIGHT-OF-WAY
<br />1
<br />LS
<br />$ 5,000.00
<br />$ 5,000.00
<br />8
<br />COMMON EXCAVATION, UNDISTRIBUTED
<br />200
<br />CYS
<br />$ 50.00
<br />.$ ...... .. _ 10,000.00 mm
<br />9 ........
<br />mmSURFACE MILLING, ASPHALT, 1 1/
<br />...2 IN ±
<br />600
<br />SYS
<br />$ 11. 00
<br />$ 6......._..0.....�
<br />,60 .00
<br />10
<br />_. ........
<br />NT RE
<br />PAVEMEMOVE
<br />7115
<br />SYS
<br />... .....
<br />$ 6.90
<br />......................
<br />$ 49,093.50
<br />11
<br />SIDEWALK, CONCRETE, REMOVE
<br />2060
<br />SYS
<br />$ 15.00
<br />$ 30,900.00
<br />12
<br />.. .................
<br />CURB RAMP, CONCRETE, REMOVE
<br />93
<br />SYS
<br />_..
<br />$ 47.30
<br />$ 4,398.90
<br />13
<br />CURB & G........
<br />U .._.._ _.............
<br />TER, CONCRETE, REMOVE
<br />615
<br />LFT
<br />$ 13.06
<br />............... w
<br />$ 8,031.90._..
<br />14
<br />CONCRETE HEADER REMOVE
<br />1235
<br />._._.
<br />LFT
<br />.......
<br />$ 12.63
<br />.......
<br />$ 15,598.05
<br />PLANTER WALL REMOVAL...............................�.-www
<br />115
<br />LFT
<br />$ 12.00
<br />$ 1,3 80.00
<br />16
<br />REMOVE EXIST PAVEMENT STRIPING
<br />3580
<br />LFT
<br />$ 0.75
<br />$ 2,685.00
<br />17
<br />�._._..... ..........................
<br />TREE REMOVEw
<br />15
<br />EACH
<br />$ 240.00
<br />_.... _._....
<br />$ 3,600.00
<br />1..8
<br />TEMPORARY EROSION CONTROL -...-
<br />1
<br />_.........
<br />LS
<br />$ 10,000.00
<br />_ww .....
<br />$ 10,000000.00
<br />19
<br />TEMPORARY INLET PROTECTION
<br />41
<br />EACH
<br />$ 165.00
<br />$ 6,765.00
<br />20
<br />TEMPORARY SLOT DRAIN PROTECTION
<br />1495
<br />LFT
<br />21
<br />HANDHOLE, µADJUST TO GRADE
<br />46
<br />EACH
<br />$ 150.00
<br />$ 6,900.00
<br />ANHOLE LID REPLACEMENT
<br />2
<br />EACH
<br />$ 1,800.00
<br />$ 3,600.00
<br />23
<br />STORM CASTING REPLACEMENT
<br />2....__
<br />EACH
<br />- WWWWWWWWWWWWW
<br />$ 1,800.00
<br />$ 3,600.00
<br />24
<br />PVC STORM PIPE, 12 IN
<br />90
<br />LFT
<br />$ 95.00
<br />$ 8,550.00
<br />25
<br />TRENCH DRAhN, REMOVE AND REPLACEmmmm a
<br />22
<br />LFT
<br />m$ 350.00
<br />$ _ 7,700 00mm
<br />Version 7/20/2018 Contractor's Bid for Public Works - 7