Laserfiche WebLink
BID/PROPOSAL�iw <br />CITY OF <br />SOUTH <br />BEND <br />Project Name: Michigan Street Reconstruction <br />Project Number: 118-075 <br />. <br />....... <br />_..... <br />For Bids Due: May 14, 2019 <br />Rieth.F ile Construction <br />Contractor Name: ' <br />Co.'," —In' <br />c.......... <br />_.. <br />No .:............._......... <br />_. Description <br />CITY <br />UNIT <br />UNIT PRICE ..._._ <br />.......... <br />AMOUNT <br />1 <br />................. .._. <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />_.� ... <br />LS <br />$ 234, 306.55 <br />$ 234,306.55 <br />2 <br />....................... <br />MAINTAINING TRAFFIC <br />_.... .....__ ._....W <br />1 <br />LS <br />_ ... <br />$ 50,000.00 <br />$ 50,000.00 <br />3 <br />CONSTRUCTION _..n_.. <br />ENGINEERING <br />1 <br />LS <br />$ 40,000.00 <br />$ 40,000.00 <br />4 <br />......._ . ............... <br />CPMmSCHEDULE <br />_ <br />1 <br />LS <br />... _........... w_ww <br />$ 2,000.00 <br />....-........... ....a <br />$ 2,000.00 <br />5 .... <br />CPMmSCHEDULE, MONTHLY UPDAit ........... <br />4 <br />EACH <br />$ 25.00 <br />$ 100.00 <br />............... <br />6 <br />VIDEO RECORD <br />1 <br />-LS <br />�.�..... <br />$ 7,500.00 <br />$ 7,500 .00 <br />7 <br />CLEARING RIGHT-OF-WAY <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />8 <br />COMMON EXCAVATION, UNDISTRIBUTED <br />200 <br />CYS <br />$ 50.00 <br />.$ ...... .. _ 10,000.00 mm <br />9 ........ <br />mmSURFACE MILLING, ASPHALT, 1 1/ <br />...2 IN ± <br />600 <br />SYS <br />$ 11. 00 <br />$ 6......._..0.....� <br />,60 .00 <br />10 <br />_. ........ <br />NT RE <br />PAVEMEMOVE <br />7115 <br />SYS <br />... ..... <br />$ 6.90 <br />...................... <br />$ 49,093.50 <br />11 <br />SIDEWALK, CONCRETE, REMOVE <br />2060 <br />SYS <br />$ 15.00 <br />$ 30,900.00 <br />12 <br />.. ................. <br />CURB RAMP, CONCRETE, REMOVE <br />93 <br />SYS <br />_.. <br />$ 47.30 <br />$ 4,398.90 <br />13 <br />CURB & G........ <br />U .._.._ _............. <br />TER, CONCRETE, REMOVE <br />615 <br />LFT <br />$ 13.06 <br />............... w <br />$ 8,031.90._.. <br />14 <br />CONCRETE HEADER REMOVE <br />1235 <br />._._. <br />LFT <br />....... <br />$ 12.63 <br />....... <br />$ 15,598.05 <br />PLANTER WALL REMOVAL...............................�.-www <br />115 <br />LFT <br />$ 12.00 <br />$ 1,3 80.00 <br />16 <br />REMOVE EXIST PAVEMENT STRIPING <br />3580 <br />LFT <br />$ 0.75 <br />$ 2,685.00 <br />17 <br />�._._..... .......................... <br />TREE REMOVEw <br />15 <br />EACH <br />$ 240.00 <br />_.... _._.... <br />$ 3,600.00 <br />1..8 <br />TEMPORARY EROSION CONTROL -...- <br />1 <br />_......... <br />LS <br />$ 10,000.00 <br />_ww ..... <br />$ 10,000000.00 <br />19 <br />TEMPORARY INLET PROTECTION <br />41 <br />EACH <br />$ 165.00 <br />$ 6,765.00 <br />20 <br />TEMPORARY SLOT DRAIN PROTECTION <br />1495 <br />LFT <br />21 <br />HANDHOLE, µADJUST TO GRADE <br />46 <br />EACH <br />$ 150.00 <br />$ 6,900.00 <br />ANHOLE LID REPLACEMENT <br />2 <br />EACH <br />$ 1,800.00 <br />$ 3,600.00 <br />23 <br />STORM CASTING REPLACEMENT <br />2....__ <br />EACH <br />- WWWWWWWWWWWWW <br />$ 1,800.00 <br />$ 3,600.00 <br />24 <br />PVC STORM PIPE, 12 IN <br />90 <br />LFT <br />$ 95.00 <br />$ 8,550.00 <br />25 <br />TRENCH DRAhN, REMOVE AND REPLACEmmmm a <br />22 <br />LFT <br />m$ 350.00 <br />$ _ 7,700 00mm <br />Version 7/20/2018 Contractor's Bid for Public Works - 7 <br />