Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project ectName: <br />2019 Curb and Sidewalk Construction <br />Project Number: <br />119-004 <br />For Bids Due: <br />May 14, 2019 at 9:30am Local Time <br />Contractor Name: <br />DIVISION C2 <br />... .............. <br />Item Description <br />No. <br />1 CONCRETE SIDEWALK, REMOVE <br />2 CONCRETE SIDEWALK, 4-IN <br />3 CONCRETE CURB, REMOVE <br />4.. CONCRETE CURB, . _.......I...__u_w ____....... <br />MODIFED <br />5 CONCRETE APPROACH, REMOVE <br />6 PCCP FOR APPROACHES, 6-IN <br />7 TOPSOIL ­AND SEEDING <br />11 TREE, REMOVE, 30 IN <br />PLANT, DECIDUOUS TREE, SINGLE STEM, <br />14 2-IN TO 2.5 IN <br />15 _ CURB RAMP, REMOVE <br />16 ONE-WAY PERPENDICULAR CURB RAMP <br />17 PAIRED PERPENDICULAR CURB RAMP <br />DIVISION <br />D1 <br />.... <br />Item <br />No. <br />ion <br />Description <br />1 <br />_ <br />CONCRETE SIDEWALK, REMOVE- ................ <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />3 <br />CONCRETE CURB, REMOVE <br />4 <br />CONCRETE CURB, MODIFIED <br />7_.. <br />TOPS. __. <br />OIL AND SEEDING_ <br />_11 <br />TREE, REMOVE, 30 IN <br />PLANT, DECIDUOUS TREE, SINGLE <br />14 <br />STEM, 2-IN TO 2.5 IN <br />_ <br />15 <br />CURB RAMP, REMOVE <br />ONE-WAY PERPENDICULAR CURB <br />16 <br />RAMP <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />DIVISION <br />D2 <br />Item <br />Description <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />3 <br />CONCRETE CURB, REMOVE <br />4 <br />CONCRETE CURB, MODIFIED -_..... _....... <br />5 <br />CONCRETE APPROACH, REMOVE <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />7 <br />TOPSOIL AND SEEDING <br />15 <br />CURB RAMP, REMOVE <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />Quantity I Unit h Unit Price <br />190 <br />SYS <br />"3,Lgm, mmm <br />190 <br />SYS <br />R , <br />357 _ <br />LFT.. <br />.... <br />357 <br />LFTIT <br />_79, -7 [ <br />40 <br />SYS <br />/ 7. �U <br />40 <br />SYS <br />9, yU <br />357 <br />SYS <br />J <br />2 ._... <br />_ EA <br />W A- <br />Total Amount <br />l4, , 606, . n-a <br />ay <br />2 EA S-to <br />24 SYS _ ' .. o, <br />8 SYS a (4J. vJ 1 _a!?.... <br />16 SYS 1 78. �AJ <br />DIVISION C2 TOTAL 14 <br />Quantity I Unit 1I Unit Price I Total Amount <br />391 <br />SYS <br />a (a, — <br />9,P <br />391 <br />SYS <br />r'7_ ui <br />4, 017. v.o <br />�370 <br />LFT.. <br />... <br />LFT <br />7a 7�a <br />_._370 <br />370--- <br />SYS <br />.. __1— <br />—2 _ <br />EA <br />owl <br />4 ojo. .'). <br />2 <br />EA <br />Ste. <br />56 <br />SYS <br />1 vim. yo <br />Co (� 9�', ti <br />24 <br />SYS <br />110.1-1 <br />32 <br />SYS <br />14,0".v <br />.a <br />% <br />DIVISION 01 TOTAL i a u, (,oS, y � <br />Quantity h Unit j Unit Price 1' Total Amount <br />188 <br />SYS <br />188 <br />SYS <br />1, S <br />/ 9 <br />168 <br />LFT <br />S— <br />LA . (D <br />168 _ <br />LFT <br />l r`' <br />Ax). q <br />20............ <br />SYS <br />Jw.... <br />20 _..... <br />SYS <br />130 <br />SYS <br />3S. LO <br />16 <br />SYS <br />16. <br />SYS <br />...... <br />_.......: <br />(ocq. <br />DIVISION <br />D2 TOTAL <br />Version 10/17/2017 Contractors Bid for Public Works - 2 <br />