Laserfiche WebLink
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />M1110inki A4 <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />2019 Curb and Sidewalk Construction <br />119-004 <br />May 14,2019 at9:30am Local Time <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />. ........ . ..... <br />Unit Price <br />Total Amount <br />... <br />........... 1 <br />CONCRETE SIDEWALK, REMOVE <br />. ........... . . . ........ <br />_CONCRETE <br />364 <br />SYS__ <br />c)0 <br />� 3, <br />0 _2 <br />.... � <br />SIDEWALK, 4-1—N <br />364 ...... <br />t6 <br />.. SYS_ITITIT <br />3CONCRETE <br />CURB, REMOVE <br />0 3 <br />LFT <br />/0"o <br />C � /O,V/o <br />4 <br />CONCRETE CURB, MODIFIED <br />603 <br />LFT <br />5 <br />CONCRETE APPROACH, REMOVE <br />50 <br />Sys <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />Sys <br />() '4 0 6, <br />7 <br />TOPSOIL AND SEEDING . ............ .. <br />454 <br />SYS <br />010-7-0 ' <br />1, <br />%317, RQ_ <br />11 <br />TREE, REMOVE, 30 IN <br />2 <br />EA <br />. ....... <br />1#1 1 00 <br />........ ...... <br />STUMP, REMOVE <br />1 <br />EA <br />A_iD <br />-7 D <br />_&P !­u ... ..... <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2-IN TO 2.5 IN <br />3 <br />EA <br />6 '70 - 0_2 <br />15 <br />CURB RAMP, REMOVE <br />40 <br />SYS <br />00 , 0 <br />16 <br />ONE-WAY PERPEN LAR CURB RAMP <br />G <br />ONE-WAY - - .. . . . . . . ..................................... <br />8 <br />SYS <br />-3 Lb <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />16.0 <br />SYS <br />70, 0J <br />8 <br />-DEPRESSED CORNER., CURB ..,RAMP,.. ---- - ------- <br />.. ....... ........ ...... <br />16.0 <br />SYS <br />43.13 <br />L J 0*. u <br />DIVISION <br />BI <br />Item <br />No. <br />Description <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />3 <br />CONCRETE CURB, REMOVE <br />4 <br />dd'K'dR_tJT_ECURB, MODIFIED <br />5 <br />CONCRETE APPROACH, REMOVE <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />7 <br />TOPSOIL J ----------- —i-t—i"""", "_ <br />AND SEEDING <br />DIVISION <br />C1 <br />Item <br />No. <br />Description <br />................................... <br />CONCRETE SIDEWALK, REMOVE <br />2CONCRETE <br />SIDEWALK, 4-"1' <br />3 <br />CONCRETE CURB, REMOVE <br />4 <br />CONCRETE CURB, MODIFIED <br />5 <br />CONCRETE APPROACH, REMOVE <br />PCCP...FOR APPROACHES, 6-IN <br />TOPSOIL AND SEEDING <br />11 <br />-TREE, REMOVE, 30 IN . .................. <br />-STUMP, <br />13 <br />REMOVE <br />PLANT, DECIDUOUS TREE, SINGLE <br />14 <br />STEM, 2-IN TO 2.5 IN <br />15 <br />_ <br />60R6RAMP, REMO_V <br />PAiRED PERPENDICULAR CURB RAMP <br />DIVISION Al TOTAL)' J . �('?, As — <br />Quantity � Unit I Unit Price N Total Amount <br />179 <br />179 <br />§Y <br />242 <br />LF <br />50/, a <br />242 <br />LF <br />2 3) 90 <br />20 <br />I _JD <br />3c?2,0 <br />20 <br />242 .. <br />........... SY <br />LTsnv_) <br />W.. <br />U <br />DIVISION BI TOTAL <br />YN, 20 <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />320 <br />SYS .. <br />...... <br />/0 qg;?, (_to <br />320 <br />SYS <br />631 <br />LFT <br />I e4, 6o <br />. . . . . ....... .. <br />n. <br />631 <br />LFT <br />gi-t, <br />Y, Tor, -1,), <br />162 <br />SYS <br />162 <br />Sys <br />631 . <br />SYS <br />........... <br />16, dw <br />/0 <br />_.J_ a- <br />1 ---- <br />--- <br />....... A1,111Q1120— <br />1 <br />EA <br />5W OD <br />2 <br />EA <br />32 JSYS <br />DIVISION C1 TOTAL 'fAJ._J.,_1"'" <br />Version 10/17/2017 Contractors Bid for Public Works -1 <br />