Laserfiche WebLink
REGULAR MEETING APRIL 23, 2019 ill <br />OPENING OF QUOTATIONS — HYDRANT FLOW TESTING — PROJECT NO 119-041 <br />(WATER WORKS PROFESSIONAL SERVICES <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />M.E. SIMPSON CO., INC. <br />3406 Enterprise Ave. <br />Valparaiso, IN 46383 <br />Quotation was submitted by Michael Simpson <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $53,851.00 <br />SHAMBAUGH & SON, LP <br />56575 Twin Branch Dr., Suite A <br />Mishawaka, IN 46545 <br />Quotation was submitted by Mark Manninen <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $52,477.25 <br />Upon a motion made by Ms. Dorau, seconded by Ms. Miller and carried, the above quotations <br />were referred to Engineering for review and recommendation. Mr. Gilot noted these should go to <br />Water Works, not the Engineering Department. <br />OPENING OF QUOTATIONS — LAFAYETTE BUILDING DRAIN REPLACEMENT — <br />PROJECT NO. 119-042A (RWDA TIFF <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotation was opened and read: <br />NIEZGODSKI PLUMBING, INC. <br />232 N. Mayflower Road <br />South Bend, IN 46619 <br />Quotation was submitted by Sheila Niezgodski <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $37,127.00 <br />Upon a motion made by Ms. Dorau, seconded by Ms. Miller and carried, the above quotation <br />was referred to Engineering for review and recommendation. <br />AWARD BID AND APPROVE CONTRACT — HISTORIC LEEPER PARK <br />IMPROVEMENTS — PROJECT NO. 118-010A (RWDA TIFF <br />Mr. Kyle Silveus, Engineering, advised the Board that on April 18, 2019, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Silveus noted that all of <br />the bidders had errors in their line item totals that affected the total bid amounts. He noted <br />Ancon's correct total is $1,308,129.03; Larson Danielson Construction Co.'s corrected total is <br />$1,379,972.39; and Holladay Construction Group's corrected total is $1,835,193.53. Mr. Silveus <br />stated after review and corrections which did not affect the bid order, he recommends that the <br />Board award the contract to the lowest responsive and responsible bidder Ancon Construction <br />Co, Inc., 2146 Elkhart Road, Goshen, IN, 46526 in the amount of $1,308,129.03. Therefore, Ms. <br />Dorau made a motion that the recommendation be accepted and the bid be awarded and the <br />contract approved as outlined above. Ms. Miller seconded the motion, which carried. <br />AWARD QUOTATION — EAST BANK SINKHOLE REPAIRS — PROJECT NO 118 305A <br />(STREETS AND ALLEYS) <br />Mr. Scott Kreeger, Engineering, advised the Board that on April 9, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Kreeger recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Northern Indiana Construction Co., Inc., PO Box 1333, Mishawaka, IN <br />46546, in the amount of $68,728 for the Base Quote plus Alternate No. 2. Therefore, Ms. Dorau <br />made a motion that the recommendation be accepted and the quotation be awarded as outlined <br />above. Ms. Miller seconded the motion, which carried. <br />1 <br />1 <br />