Laserfiche WebLink
Prida.k September 24th..1920, <br />Board met' in, regular sass idn at 10:,00 A.M. All members present. <br />bids *6,04 received t-he toll' following improvement, <br />Pavement on Ewing A venue f r0m Miohig <br />an Street to Miami Street under <br />Improvement Resolution No, <br />BId -of mho Vhitel, Construction Ct�iapany� of Milwaukee,,. Wisconsin. <br />'Walk per sq. �ii.....•!••.•••.••.••••,••••.�r..r•'.•••�• .25 <br />Curb per `lin ft.. ,........ .....,..... .75 <br />Grading per cu. yd ....:..... ..... • ...:': •:1.. .......1. 50 <br />Asphalt pavement Trinidad Natural Lake Asphalt <br />v <br />per sq. yd.,..,,....•.....4.44 <br />CombIn4d curb. and gutter, per lint 1-35 <br />Cement curb --removed, per lin ft....: .. .... ...... ,25 <br />Curb inlets "26 each.,.,;* . 0. 0 0 <br />Asphaltic ,concrete Pavameat Trinid46d Netatral <br />8 inch conduit Lal� Asphalt per Qq. yd.....:.,..., ..4.24 <br />Pipe. ,per tin ft 1.50 <br />5t-orm, water inlets complete ........:...............16. 04 <br />M&r84i&l 'curb per lin ft.........:........ '050 <br />Resett ind Inlets, .each.... , ... ...• . • .... • •'• 0 . 3. OV <br />Resetting , manhole' co�CePS . each.. • ...... 3. 00 <br />Check $20635.00 <br />above bid -only bid received and referred to -the City Engineers for.abulat.ion to be -reported on at iOs 00 `A :,V. Tuesday beptember 28th.,.1920. - <br />Mr. Hill Of Hill Construction Cfl an _ <br />mp y a appeared. before the Board' and <br />requested permission to store material on asphalt pavement on Miami Street'near <br />C-UY Limits. so they can start on Turku Creek Road. Granted ._permiss ion .to use the <br />south end of Miami Street 200 feet for the'storage of material for constructionof <br />Turkey Creek Roadway: Permission also :granted to install industrial tracks on pitik -- <br />to be laid can ,pavement. All material t1d be off of street before freezing weather <br />Guarantee any holes in pavement. <br />Petition filed for pavemeut ©n PelloWs Street from Sample St, eet..to _ <br />Dayton Street, Same read and placed on fila. <br />Engineer filed assessment roll andfinal estimate for water c©nnec- <br />t irons on Haney Avenue from Miami -Street to Lear Street, under Improvement' Res glut ion <br />No. 820. IN the City of South Band, Indiana. <br />Resolved that notices as to the assessments bt published on the <br />27th. day Of September 19201, and on the 4th. day. of October 1g20, in the South Bend• <br />Daily Tribune , in this City, stating; that this Beard willgive ag ' hearincin they' <br />13�th day of October 1920 at. 7: i5 P.M. <br />Resolved further, that the entire work duder the above contract be <br />accepted and approved and the final estimate thereon allowed. <br />Engineer filed assessment roll and final estimate f®r water connec- <br />tions on Beale Street from Portage Avenue to Kessler Boulevard, under Impr-ovement <br />Resolution No. 807. In the City of South -Bend,. Indiana, <br />Resolved that notices as to the assessments be .published dni•t%e <br />27th. day of September 1920 sand on the 4th. day of ,October 1920 in the South Bend <br />Daily Trib-tme, stating that this Board will give a hearing Qn the 13th. day of <br />October 1920 at 7:15 P.M. <br />Resolved further that the ' ant ire work under the ahflvc contract .be: <br />accepted and approved and the final estimate threon allowed, <br />