Laserfiche WebLink
CRUMUSH AND CRUMLISH ARCHITECTS, INC. A SQUARE DEALT" SINGE 1968 <br />We have taken the liberty of developing the attached 'Pre -Design Estimate of Probable Construction Cost for <br />the project so that we could establish our work scope. This is our free suggestion of potential expected con- <br />struction costs, based on our early preliminary investigations. <br />Based on this pre -construction cost estimate and the scope of professional design services noted above, our <br />total design fee for this project is $24,000. <br />We do not expect the proposed modifications to affect life safety and exiting situations within the building and <br />therefore it is unlikely any IN DHS State Plan Review will be necessary before local building permits can be is- <br />sued. If this is later determined to be a requirement, we reserve the right to amend our fee proposal as addi- <br />tional building documentation may ultimately be required by IN DHS. <br />The building also pre -dates in IN Energy Code and therefore we believe it is not subject to any US Dept of En- <br />ergy ComCheck energy certification for the new roof. <br />Any additional services beyond those listed above will be charged at our office standard rates of $125/hr for <br />Professional Staff (licensed/registered) and $75/hr for Technical Staff. Any reimbursable expenses for such <br />items as plan review fees, blueprint shipping, etc will be charged at cost. All local travel expenses are included <br />and we have no expectation for any out-pf-town travel expenses. <br />With our current workload of design and construction documents for existing projects and clients, we can fore- <br />cast our availability to start the field-measuring/CAD layouts and design work on or after April 1, 2019. We <br />could have schematic designs completed for review and acceptance about 4 weeks later. Construction docu- <br />ments could then be ready for prospective Bidders another 6 weeks after that. Depending on bidding and <br />award procedures, actual construction might begin in early Summer 2019. Since we can't forecast contractor <br />schedules due to summer labor needs and possible project staging, the construction work may or may not be <br />completed by the end of 2019. <br />We carry full insurance for professional liability, workers' compensation and general business operations and <br />we can provide an insurance certificate for your records. <br />If you have any questions, please don't hesitate to contact me. <br />We look forward to serving the City of South Bend! <br />Sincerely, <br />Brendan Crumlish, NCARB, CCS, RA, RID, LEED GA <br />President, and IN Licensed Architect 870155 <br />crumiish and cruml!sh architects, Inc. <br />has been serving the South Bend construction community <br />with pride and achievement since 1968. <br />www.crumlishandcrumlish.com <br />Appendices Page 3 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />