Laserfiche WebLink
This is Appendix 2, Engineer Architect's Proposal for Professional Services dated <br />3/8/2019. <br />City of South Bend <br />3215 SUGAR MAPLE COURT, SUITE B <br />SOUTH BEND, INDIANA 46628 <br />PHONE: 514-282-2998 FAX:514-282-2994 <br />A SQUARE C"L- SINGE 1968 <br />WWW.GRUMLIBNANDGItUMLl814.GOM <br />March 8, 2019 <br />Scott Kreeger, Project Engineer 2019 Edison Filtration Plant Roof Reconstruction <br />Via email to: . C,C,is gl'.C.,.50.0 .berl.din4QY <br />Scott: <br />It is our pleasure to offer this proposal for professional design work for the reconstruction of the aging roof at <br />the Edison Filtration Plant in South Bend. <br />We have visited the site and we have become familiar with the general condition of the existing low -slope <br />roofs over the twin filtration pools. We have studied the 1994 building plans from Cole Assoc, provided by the <br />City. And we have reviewed the roof inspection report from 2017 from Slatile Roofing & Sheet Metal. <br />We are in agreement the existing steel truss roof system is severely corroded and needs a complete replace- <br />ment. The surface -applied foam insulation roofing above the corrugated roof deck is also severely deteriorated <br />and must be replaced <br />After careful consideration of three primary replacement structural roof systems (Wood, Concrete and Steel) <br />and many hours of research, we now believe the proper solution is to design a new, low -slope, replacement <br />steel truss roof system, with new roof deck insulation and a new membrane covering. The new structural steel <br />trusses, beam, deck and fasteners must all be hot -dip galvanized to minimize future potential corrosion from <br />the hypochlorite vapors within the twin filtration rooms. <br />Working with structural engineer, Paul Fujawa, PE, of Paul Fujawa Engineers, and Roland A Klockow, PE of <br />Rhein Bach Inc. we offer this basic scope of services to perform necessary architectural, structural and me- <br />chanical/electrical design services: <br />Field -verify and develop As -Found CAD Floor plan drawings of the Filtration Plant. Our primary fo- <br />cus will be on the twin, flanking filtration rooms, and not the central corridor or operations rooms. <br />Meet with key personnel of water department to clarify intentions, and then develop schematic <br />layouts of the project for review an acceptance by the City. <br />Design new structural roof systems, new roof coverings and related accessories, new HVAC duct- <br />work and ventilation design, and new electrical lighting design, in the twin filtration rooms. <br />Develop bidding documents and specifications for the project. <br />Prepare a pre -construction cost estimate of proposed work as eventually designed. <br />Conduct one public bidding process (with a single pre -bid meeting and assistance with bidder <br />questions), review bids received, and prepare bid -tabulation and recommendation for contract <br />award. <br />Monitor contractor construction activities, prepare periodic site visits reports, review pay applica- <br />tions and requests for modifications. <br />Appendices Page 2 <br />EJCDC E-500 Agreement Between owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />