BID/PROPOSAL
<br />u1!'
<br />CITY OF SOUTH BENDS
<br />,
<br />eep er Park
<br />ImprovementsProject Name:
<br />— Bid Package
<br />1
<br />1118
<br />Project
<br />Number: 010A
<br />1
<br />For
<br />Bids Due: April 18, 2019
<br />Contractor
<br />Name: Ancon Construction Co., Inc.
<br />..m----....-_._._....._
<br />.
<br />92
<br />DECIDUOUS SHRUB, 48" CONT,������������-
<br />6.00EACH
<br />92
<br />BROADLEAF EVERGREEN SHRUB, 1 GAL. -----
<br />—68.00
<br />EACH
<br />-�
<br />93
<br />PERENNIAL 1 GAL,
<br />............ .........
<br />1,504.00
<br />......................
<br />EACH
<br />ww
<br />94 ..............GROUND
<br />COVER, PLU........._..
<br />G
<br />2,000.00
<br />EACH
<br />_....._................................w...........
<br />95
<br />.... ........ ....... _..._._.
<br />PERENNIAL, TRANSPLANT
<br />..........................
<br />33.00
<br />EACH
<br />96............_..
<br />._ ._ `ff,"
<br />SHRUB, TRANSPLANT
<br />7.00
<br />ii.................._..........._.............—..
<br />EACH
<br />97
<br />SOIL AMENDMENT
<br />75.00
<br />CYS
<br />_.. .�
<br />98
<br />.-
<br />SHREDDED HARDWOOD BARK MULCH
<br />--- _-------- ..
<br />46.00
<br />_ _....................w
<br />CYS
<br />............................www
<br />99
<br />STEEL EDGING
<br />�..
<br />840.00
<br />LFT
<br />100
<br />.._............................ ......................
<br />BRICK PAVERS
<br />101.00
<br />SYS
<br />101
<br />_........................ ......
<br />FOUNTAIN PLAZA BANDS
<br />192.00
<br />LFT
<br />............ __
<br />102
<br />RAILING
<br />40.00
<br />LFT
<br />4-03
<br />.......................... .. ..___-----------
<br />I ITII ITV !ll ITI CTC
<br />,1--80
<br />104
<br />FOUNTAIN CONTROLLER ENCLOSURE
<br />1.00
<br />LS
<br />105
<br />EROSION CONTROL
<br />1.00
<br />1-1 LI. S
<br />1.06.................
<br />LINE, THERMOPLASTICSp..�.p..... .........�
<br />WHITE, 4 IN.
<br />_
<br />1,180.00
<br />__...a.----�.
<br />LFT
<br />,,,,,.......................................................
<br />107
<br />__. ..............
<br />LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN.
<br />.............................
<br />1,320.00
<br />LFT
<br />108
<br />................... ..
<br />IC ..
<br />LINE, THERMOPLAST,OL SID, WHITE, 6 IN.
<br />368.00
<br />LFT
<br />109
<br />TRANSVERSE MARKING, THERMOPLASTIC, STOP
<br />26.00
<br />LFTIT......
<br />LINE, WHITE,, 24 IN.
<br />........_.....___. __ .. ""
<br />110
<br />TRANSVER EIT iIT
<br />SE MARKING, THERMOPLASTIC,
<br />294.00
<br />LFT
<br />CROSSWALK LINE, WHITE, 24 IN.
<br />111
<br />GROOVING FOR PAVEMENT MARKINGS
<br />2,528.00
<br />LFT
<br />112
<br />LEEPER PARK ART FAIR
<br />1
<br />LS
<br />113
<br />FOUNTAIN CONTROL PANEL FRAME AND
<br />1
<br />LS
<br />FOUNDATION
<br />114
<br />RECEPTACLE LOAD CENTER AND SUPPORT
<br />1
<br />LS
<br />.. ................A........
<br />FRAME
<br />BASE BID TOTAL
<br />$1,297,041.32
<br />Bidder (Firm): Ancon Construction Co., INc
<br />Address: 2146 Elkhart Road
<br />City/State/Zip, Goshen, IN 46528 Telephone Number: ( 574 ) 533-9561
<br />e...........................................
<br />i
<br />By_mm —
<br />(Signature)
<br />Rhett M. Fisher, Chief Financial Officer
<br />(Printed Name of Person Signing)
<br />Version 1/17/2019 Contractor's Bid for Public Works - 57
<br />
|