Laserfiche WebLink
BID/PROPOSALtiro��ir-, <br />CITY OF SOUTH BEND <br />Project Name: Historic Leeper Park Improvements -Bid Package 1�� <br />Project Number: 118-010A�.; <br />For Bids Due: April 18, 2019 _ <br />Contractor Name: Ancon Construction Co., Inc. <br />61 <br />FOUNTAIN ELECTRICAL <br />1.00 <br />LS <br />62 <br />...._. .................... ...._.--. <br />LIGHT POLE <br />_ <br />16.00 <br />---- <br />EA <br />63 <br />_.................._... w...------. <br />LUMINAIRE <br />16.00 <br />_...--...---------.-----_ <br />EA <br />64 <br />.....-.-...- -_m.- - - - - ............................ <br />SERVICE POINT CABINET <br />1.00 <br />� � �_-._..._............................... <br />EA <br />65 <br />SERVICE POINT CABINET FOUNDATION <br />1.00 <br />EA <br />66 <br />GROUND ROD WITH CONNECTOR <br />17.00 <br />EA <br />67 <br />CONDUIT, PVC, 1 IN. <br />2,500.00 <br />LIFT <br />68 <br />CONDUIT, PVC, 2 IN. _ <br />1,000.00 <br />LFT <br />69 <br />........... <br />WIRE, THWN, NO, 2 COPPER, 3 1/C <br />500.00 <br />LFT <br />_ ......._ <br />-... <br />.............. .N,-, N,___.. <br />WIRE, THWN, N0. 8 COPPER, 1-1/C <br />................... <br />......---_....- <br />500.00 <br />...................I_70 <br />'LFT <br />_................--- <br />71 <br />. ...._..M ............. <br />WIRE, THWN, NO. 6 COPPER 12-1/C <br />-.................... <br />250.00 <br />LFT <br />...... ____...._ <br />72 <br />.......... ................. ..... .. <br />WIRE, THWN, NO. 10 COPPER, 3-1/C <br />2,500.00 <br />................ <br />LFT <br />�.3.....................� <br />CABLE -.DUCT MARKER <br />2...............00 ......................�_.............._._......... <br />,500 <br />................rr <br />LFT <br />�..... <br />74 <br />MULTIPLE COMPRESSION FITTING, <br />64.00 <br />EA <br />WATERPROOFED <br />75 <br />CONNECTOR KIT, FUSED <br />32.00 <br />EA <br />_...... <br />76 <br />- .-. .......... ......... .._____-� <br />INSULATION LINK, WATERPROOFED <br />32.00 <br />.......... <br />EA <br />........... <br />77 <br />HANDHOLE, LIGHTING <br />3.00 <br />EA <br />78 <br />FOUNTAIN FOUNDATION SLAB--__.... <br />mm1.00 <br />LS <br />79 <br />..__.......... .......................................... ....... <br />CONCRETE STEPS (ALONG TENNIS COURT) <br />102.00 <br />LFT <br />80 <br />HISTORIC CONCRETE STEPS, REBUILD <br />75.00 <br />LFT_uuu <br />81 <br />CHEEKWALL <br />90.00 <br />LFT <br />82 <br />INTERPRETIVE SIGN <br />3.00 <br />EACH <br />83 . <br />....... , r-r <br />BENCH, BACKED <br />...... <br />4.00 <br />_.-..,... <br />EACH <br />. <br />_84.- <br />_. -_ <br />-� BENCH, BACK..LESS <br />- _____....�--_�..,. <br />8.00 <br />E..... . <br />ACH <br />......................... <br />85 <br />............... .. ... <br />CUSTOM BENCH <br />.. <br />6.00 <br />EACH <br />86 <br />..--- ...... .................M ................... _. _-_ <br />BIKE RACK <br />6.00 <br />_._ .......-..................... <br />EACH <br />......... <br />87 <br />TRASH CANS <br />.......... _.. <br />3.00 <br />EACH <br />_ .-_- <br />88 <br />-. .......... ._................................................... <br />SHADE TREE, 3 IN CAL. <br />23.00 <br />EACH <br />89 <br />FLOWERING TREE, 1.5" CAL. <br />25.00 <br />EACH <br />90 <br />FLOWERING TREE, CLUMP <br />19.00 <br />EACH <br />91 .m.....n <br />CONIFEROUS EVERGREEN TREE (10-12 FT.) <br />12.00 ..-.....EACH <br />Version 1/17/2019 Contractor's Bid for Public Works - 56 <br />