Laserfiche WebLink
' 686 <br />Tuesday May 20th.,1919. Contnued. <br />t <br />The following bid submitted for pipe sewer in M�rquette Perk by Geogge <br />Harrop, Contractor and same awarded to him. ° <br />° <br />10 inch pipe sewer, per lip ft................... 2.35 <br />8 inch pipe sewer, per tin ft................... .75. <br />6 inch pipe sewer, .per lin ft................... .75 <br />M&nholes,,per foot in depth ....................... 5.00 <br />Manholes. -curbs and covers, each.... ....'........1?.50 <br />Storm water inlets complete ............ ...'....... .10;00 <br />The following contract was approved by the Board. <br />CONTRACT. <br />THIS AGREMENT made and entered into this 20th. , day of May 1919 <br />by and between L. H. VanderKarr, party of the first part, and the City of South <br />Bend, Indiana, by its Board_ of Public Works, party of the second part , WITNESSEKM <br />That for and in consideration of the parties hereinafter stated, to be <br />paid to the party pf the first part by the party of the second part, the said <br />party of the first Part hereby agrees to repair all asphalt pavements in the streets <br />of said City under the direction of the Street Commissioner and to furnish all <br />materials and labor required In dobt g said work until January lst., 1920. All of <br />said re Nair ing is to be done at places as directed by the Street Commissioner of <br />said City, or by his deputy. Saud party of the first part agrees to use first <br />class material in dot#g said work, and he further agrees to use first class mater ial. <br />it dot#g said work, and he further agrees to place barricades and red lights at <br />the places where said: repair work is being done by him, in such manner as to protect <br />all persons, in using said street, from injury. <br />In consideration of the performance of said work by the party of the <br />first part. the said party of the second part agrees to pay hits therefor the sum of <br />Two Dollars and thirty five cents ($2.35# per sq. yd. for all resurfacing and re- <br />pair work , except Where the grouting or foundation concrete is broken through or' in <br />suchcondition that it cannot be used, in which instance the party of the first part <br />shall receive three ($3. 00) Dollars per square yard. Said sums are to be paid after <br />said work has been inspected and approved by the Street C ommiss ioner of said City, <br />or by the City Civil Engineer. <br />The party of the first part further agrees that he will do all work <br />in a good workmanlike manner, and that he hereby guarantees all of said repair <br />work to be and --remain in .good condition for a period of one year from the time` such <br />re^air work Is done; and if duAing said year, said repair work so done should, be- <br />e ore defective, the- party of the f first part agrees to re :.lace the same, with ,good, <br />material or upon fail.'To to do so, to refund to said City the amount .received by him <br />for such repairing. <br />And. said party ofr the first part further agrees to indemnify and,_ save <br />harmless the -said party of the second part from all damages to any person or propert <br />by reason of the negligent performance of said Work by the party of the first part, <br />And said party Of the first part further agrees that after repairing any placed <br />In any of the streets of said City, ate will immediately thereafter remove all dirt <br />and refuse to the curb of said street. <br />And it is further agreed that the party of the first past may use all <br />material taken out of the street repaired by him, which material is to in first <br />class condition a.nd suitable to be used in doing said repair work.. <br />And said party of the second part, as a part of the consideration of <br />this contract, agrees to loan to said party of the first part, asphalt plant, all <br />asphalt tools, which is now owns, and said party` of the first part agrees to pay <br />for the use of the same and for such time as said tolls are actually used, give (5) <br />cents per sq. yd. of asphalt surface laid and said f first part agrees to keep said <br />tools and plant in good repair and return the same to said party of the second part <br />in good condition less natural wear and tear, <br />