Laserfiche WebLink
Version 6-8-2017 <br />Fee <br />APPENDIX "D" <br />A. Preliminary Engineering <br />B. Environmental <br />C. Construction Engineering <br />D. Total <br />Breakdown of fees is attached. <br />24 <br />LUMP SUM <br />LUMP SUM <br />T&M NTE <br />$50,068.00 <br />$19,304.00 <br />$10,000.00 <br />$79,372.00 <br />