Laserfiche WebLink
This is EXHIBIT L, consisting of 9 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated November 13, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 2 <br />1. Background Data. - <br />a. Effective Date of Owner -Engineer Agreement: November 13, 2018 <br />b. Owner: Board of Public Works, City of South Bend <br />C. Engineer: DLZ Indiana, LLC <br />d. Project: Pinhook Park Improvements <br />2. Description ofModifications; <br />a. Engineer shall perform or furnish the following Additional Services under Part I — Basic <br />Services: <br />A1.05 Preliminary Construction Document Phase <br />A. After acceptance by Owner of the Preliminary Schematic Design deliverable, the <br />Engineer shall: <br />1. Prepare Preliminary construction documents consisting of preliminary <br />drawings and draft technical specifications for the Project. The project will <br />be prepared as two design packages as follows: <br />a. Sitework Design package will include trail and access improvements, <br />water recreation improvements, and play elements as established in the <br />Schematic Design Deliverable (Approximately $1,042,000 construction <br />cost). Drawings shall include at minimum: <br />1) Removals and Site Preparation Plan (including tree protection) <br />2) Site Layout Plan <br />3) Site Grading and Erosion Control Plan <br />4) Site Utilities Plan <br />5) Planting Plan <br />6) Playground Layout and Materials Schedule <br />7) Site Details <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />