My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Douglas Road Lift Station
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Douglas Road Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:09:11 PM
Creation date
3/27/2019 2:01:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT C, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer for <br />Professional Services dated 3/26 , 2019. <br />Payments to Engineer for Services and Reimbursable Expenses <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, a total fee amount not to <br />exceed $108,800.00, as follows: <br />1. A Lump Sum amount of $96,000.00 based on the following estimated distribution of <br />compensation: <br />I . '.1 0- i <br />1) Field Survey $ 1,900.00 <br />2) Utility Coordination $ 800.00 <br />3) Geotechnical Services $ 2,300.00 <br />4) Environmental Services $11,000.00 <br />5) Lift Station and Forcemain Design $68,500.00 <br />6) IDEM Wastewater Construction Permit $ 3,000.00 <br />7) Permit Updates to Douglas Road Reconstruction Project $ 8,5W00 <br />Total Lump Sum Fee $96,000.00 <br />2. The total compensation for Standard Hourly Rates Method of Payment services and <br />Expenses is estimated to be $12,800.00 based on the following estimated distribution of <br />compensation: <br />a. Bidding Phase and Construction Phase Office Services (Hourly Rate) $10,800.00 <br />b. Right of Way Engineering and Acquisition Services (based on construction <br />Easements on 2 separate parcels) .1'IOCL("10 <br />Total Hourly Rate Fee $12,800.00 <br />3. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />5. Standard Hourly Rates Method of Payment shall include amount equal to the cumulative <br />hours charged to the Project by each class of Engineer's personnel times Standard Hourly <br />Page 1 <br />Exhibit C —Compensation Packet BC-2: Basic Services (other than RPR) — Standard Hourly Rates Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.