Laserfiche WebLink
M. Provide the services of an independent testing laboratory to perform all inspections, tests, and <br />approvals of samples, materials, and equipment required by the Contract Documents, or to <br />evaluate the performance of materials, equipment, and facilities of Owner, prior to their <br />incorporation into the Work with appropriate professional interpretation thereof. If Owner <br />designates a construction manager or an individual or entity other than, or in addition to, Engineer <br />to represent Owner at the Site, define and set forth as an attachment to this Exhibit B the duties, <br />responsibilities, and limitations of authority of such other party and the relation thereof to the <br />duties, responsibilities, and authority of Engineer. <br />N. Provide Engineer with the findings and reports generated by the entities providing services to <br />Owner pursuant to this paragraph. Attend the pre -bid conference, bid opening, pre -construction <br />conferences, construction progress and other job -related meetings, and Substantial Completion and <br />final payment visits to the Project. <br />O. Inform Engineer in writing of any specific requirements of safety or security programs that are <br />applicable to Engineer, as a visitor to the Site. <br />P. Provide Engineer with the findings and reports generated by the entities providing services to <br />Owner pursuant to this paragraph. <br />Q. Inform Engineer in writing of any specific requirements of safety or security programs that are <br />applicable to Engineer, as a visitor to the Site. <br />R. Perform or provide the following services: <br />1. Operation and Maintenance manuals for the existing lift station. <br />2. Existing groundwater data. <br />3. Provide as -built construction plans for previous projects near the proposed project, which <br />have been built by the Owner. <br />4. Televise the existing sewers as requested by the Engineer. <br />5. Provide a vactor truck crew to assist the Engineer with field investigations. <br />6. Provide the existing Douglas Road lift station pump design parameters (Flow rate, total <br />dynamic head and horsepower.) The replacement pumps, to be designed in this contract, <br />will have identical pump design parameters to the existing pumps. <br />7„ Develop and execute a local governmental agreement between the City of South Bend and <br />St. Joseph County, Indiana. <br />Page 3 <br />(Exhibit B — Owner's Responsibilities) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. Ali rights reserved. <br />