My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Douglas Road Lift Station
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Douglas Road Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:09:11 PM
Creation date
3/27/2019 2:01:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10. Change Orders and Work Change Directives: DELETED <br />11. Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for general conformance with the design concept of the completed Project <br />as a functioning whole as indicated by the Contract Documents. Such reviews and <br />approvals or other action will not extend to means, methods, techniques, sequences, or <br />procedures of construction or to safety precautions and programs incident thereto. Engineer <br />shall meet any Contractor's submittal schedule that Engineer has accepted. <br />12. Substitutes and "or -equal".- Evaluate and determine the acceptability of substitute or "or - <br />equal" materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02. A.2 of this Exhibit A. <br />13. Inspections and Tests: DELETED <br />14. Disagreements between Owner and Contractor: DELETED <br />15. Applications for Payment: DELETED <br />16. Contractor's Completion Documents: DELETED <br />17. Substantial Completion: DELETED <br />18. Additional Tasks: Perform or provide the following additional Construction Phase tasks or <br />deliverables: <br />a. The Engineer shall provide design support to the Resident Project Engineer, as directed <br />by the Owner. <br />b. The Engineer will meet at the project site with the Owner or their Resident Project <br />Engineer, as directed by the Owner, to assist in any matter that may arise during the <br />construction of the project. <br />19. Final Notice of Acceptability of the Work: DELETED <br />B. Duration of Construction Phase: DELETED <br />C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />A1.05 Post -Construction Phase: DELETED <br />PART 2 — ADDITIONAL SERVICES <br />Page 9 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer For Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.