Develop suggested general construction sequencing parameters that will serve as a <br />guideline for the Contractor during construction. The lift station contractor will be <br />required to develop the actual construction sequence. <br />k. Provisions will be incorporated into the bid documents for relocating the existing <br />telemetry system in the existing lift station to the new lift station site once the existing <br />lift station is taken off-line. <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the Engineer receives preliminary design phase comments from the Owner and given the <br />notice to proceed to the final design phase. <br />A1.02 Final Design Phase <br />A. After acceptance by Owner of the Preliminary Design Phase documents and any other deliverables <br />subject to any Owner -directed modifications or changes in the scope, extent, character, or design <br />requirements of or for the Project, and upon written authorization from Owner, Engineer shall: <br />1. Conduct two (2) meetings with the Owner regarding the final design phase of the project. <br />2. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. Drawings and specifications will be <br />incorporated into the Douglas Road Reconstruction project construction documents, <br />including: <br />a. Demolition Plans and Specifications <br />1) Prepare demolition plans and specifications for the removal of the existing lift <br />station wet well, forcemain and associated components that are to be replaced. It is <br />anticipated that the existing lift station wet well will be removed to a minimum <br />depth of five feet below grade and abandoned in place; selective demolition will be <br />necessary for piping, mechanical and electrical components. <br />2) The Project plans and specifications shall be limited to the work identified herein for <br />the demolition of the lift station and miscellaneous site accessories that presently <br />exist at the site. Items will be specified to be demolished or to be abandoned in <br />place. <br />3) Where foundations or existing structures are intended to be abandoned in -place, the <br />Engineer shall specify the depths or conditions to which the structure will remain or <br />be removed. <br />b. Gravity sanitary sewer and forcemain relocation plans <br />1) Design shall incorporate the installation of new sanitary sewer pipes and manholes, <br />connections to existing sewers, removal of existing structures, abandonment of <br />existing sanitary sewers (cutting, capping and filling with flowable fill), inclusion of <br />details and specifications required for pipe materials, bedding and backfill, and <br />testing. <br />Page 5 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />