My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - American Structurepoint Inc - Pinhook Water Treatment Plant
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - American Structurepoint Inc - Pinhook Water Treatment Plant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:59:36 PM
Creation date
3/27/2019 1:48:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: DF6AA6FA-1DAD-4DBC-9195-DC507E7C3EB9 <br />defects, and make recommendations as to replacement or correction of defective Work, if <br />any. <br />Together with Owner or Owner's representative, visit the Project within one month before <br />the end of the correction period to ascertain whether any portion of the Work is subject to <br />correction. <br />B. The Post -Construction Phase services may commence during the Construction Phase and, if not <br />otherwise modified in this Exhibit A, will terminate twelve months after the commencement of the <br />Construction Contract's correction period. <br />The services listed above represent the total scope of work as we understand it at this time. Should the <br />need for Additional Services arise, we are willing to provide them for a supplemental fee per PART 2 of <br />this Exhibit of the Agreement upon written approval from the Owner. <br />A1.08 Schedule <br />The following is a proposed schedule based upon our understanding of the engineering work required. <br />Notice to Proceed <br />One (1) week from executed agreement <br />Kickoff Meeting/Site Visit <br />Scheduled one (1) week from Notice to Proceed <br />Review of Existing <br />One (1) week after receipt from Owner <br />Information <br />Basis of Design Memo <br />Three (3) weeks after Information Review <br />Preliminary Design <br />Four (4) weeks after revision of Basis of Design <br />submittal <br />Memo per Owner review comments <br />Final Design submittal <br />Four (4) weeks after revision of Preliminary Design <br />per Owner review comments <br />Bidding <br />Begin two (2) weeks after revision of Final Design <br />per Owner review comments <br />Construction Administration <br />Begin after contractor Notice to Proceed <br />RFIs <br />Address within three (3) business days of receipt <br />Submittal Review <br />Return within seven (7) calendar days of receipt <br />Walk-through <br />Upon substantial completion of the Work <br />Pagel 0 <br />(Exhibit A — Engineers Services) <br />EJCDC E-500 Agreement Between Owneand Engineer for Professional Services <br />Copyright U 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.