DocuSign Envelope ID: DF6AA6FA-1DAD-4DBC-9195-DC507E7C3EB9 <br />16. Contractor's Completion Documents: Receive, review, and transmit to Owner maintenance <br />and operating instructions, schedules, guarantees, bonds, certificates or other evidence of <br />insurance required by the Contract Documents, certificates of inspection, tests and <br />approvals, Shop Drawings, Samples and other data approved as provided under Paragraph <br />A1.05.A.11, and transmit the annotated record documents which are to be assembled by <br />Contractor in accordance with the Contract Documents to obtain final payment. The extent <br />of such review by Engineer will be limited as provided in Paragraph A1.05.A.11. <br />17. Substantial Completion: Promptly after notice from Contractor that Contractor considers <br />the entire Work ready for its intended use, in company with Owner and Contractor, visit the <br />Project to determine if the Work is substantially complete. If after considering any <br />objections of Owner, Engineer considers the Work substantially complete, Engineer shall <br />deliver a certificate of Substantial Completion to Owner and Contractor. <br />18. Final Notice of Acceptability of the Work: Conduct a final visit to the Project to determine <br />if the completed Work of Contractor is acceptable so that Engineer may recommend, in <br />writing, final payment to Contractor. Accompanying the recommendation for final <br />payment, Engineer shall also provide a notice in the form attached hereto as Exhibit E (the <br />"Notice of Acceptability of Work") that the Work is acceptable (subject to the provisions of <br />Paragraph A1.05.A.15.b) to the best of Engineer's knowledge, information, and belief and <br />based on the extent of the services provided by Engineer under this Agreement. <br />B. Duration of Construction Phase: The Construction Phase will commence with the execution of the <br />first Construction Contract for the Project or any part thereof and will terminate upon written <br />recommendation by Engineer for final payment to Contractors. If the Project involves more than <br />one prime contract as indicated in Paragraph A1.03.C, then Construction Phase services may be <br />rendered at different times in respect to the separate contracts. Subject to the provisions of Article <br />3, Engineer shall be entitled to an equitable increase in compensation if Construction Phase services <br />(including Resident Project Representative Services, if any) are required after the original date for <br />completion and readiness for final payment of Contractor as set forth in the Construction Contract. <br />C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />A1.07 Post -Construction Phase <br />A. Upon written authorization from Owner during the Post -Construction Phase Engineer shall: <br />1. Together with Owner, visit the Project to observe any apparent defects in the Work, assist <br />Owner in consultations and discussions with Contractor concerning correction of any such <br />Page9 <br />(Exhibit A — Engineers Services) <br />EJCDC E-500 Agreement Between Owneand Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />