My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - American Structurepoint Inc - Pinhook Water Treatment Plant
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - American Structurepoint Inc - Pinhook Water Treatment Plant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:59:36 PM
Creation date
3/27/2019 1:48:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: DF6AA6FA-IDAD-4DBC-9195-DC507E7C3EB9 <br />nor for any failure of Contractor to comply with Laws and Regulations applicable to <br />Contractor's furnishing and performing the Work. Accordingly, Engineer neither <br />guarantees the performance of any Contractor nor assumes responsibility for any <br />Contractor's failure to furnish or perform the Work in accordance with the Contract <br />Documents. <br />8. Defective Work: Reject Work if, on the basis of Engineer's observations, Engineer believes <br />that such Work (a) is defective under the standards set forth in the Contract Documents, (b) <br />will not produce a completed Project that conforms to the Contract Documents, or (c) will <br />imperil the integrity of the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. <br />9. Clarifications and Interpretations; Field Orders: Issue necessary clarifications and <br />interpretations of the Contract Documents as appropriate to the orderly completion of <br />Contractor's work. Such clarifications and interpretations will be consistent with the intent <br />of and reasonably inferable from the Contract Documents. Subject to any limitations in the <br />Contract Documents, Engineer may issue field orders authorizing minor variations in the <br />Work from the requirements of the Contract Documents. <br />10. Change Orders and Work Change Directives: Recommend change orders and work change <br />directives to Owner, as appropriate, and prepare change orders and work change directives <br />as required. <br />11. Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for conformance with the information given in the Contract Documents <br />and compatibility with the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. Such reviews and approvals or other action will <br />not extend to means, methods, techniques, sequences, or procedures of construction or to <br />safety precautions and programs incident thereto. Engineer shall meet any Contractor's <br />submittal schedule that Engineer has accepted. Submittal review will include up to two <br />iterations; anything beyond that will be considered an Additional Service. <br />12. Substitutes and "or -equal".- Evaluate and determine the acceptability of substitute or "or - <br />equal" materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />13. Inspections and Tests: Require such special inspections or tests of Contractor's work as <br />deemed reasonably necessary, and receive and review all certificates of inspections, tests, <br />and approvals required by Laws and Regulations or the Contract Documents. Engineer's <br />review of such certificates will be for the purpose of determining that the results certified <br />indicate compliance with the Contract Documents and will not constitute an independent <br />evaluation that the content or procedures of such inspections, tests, or approvals comply <br />with the requirements of the Contract Documents. Engineer shall be entitled to rely on the <br />results of such tests. <br />Page7 <br />(Exhibit A — Engineers Services) <br />EJCDC E-500 Agreement Between Owneand Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.