Laserfiche WebLink
DocuSign Envelope ID: DF6AA6FA-1DAD-4DBC-9195-DC507E7C3EB9 <br />Resident Project Representative (RPR): DELETED. RPR services are not included in this <br />agreement and can be provided if requested. <br />Selecting Independent Testing Laboratory: Assist Owner in the selection of an independent <br />testing laboratory to perform the services identified in Exhibit B, Paragraph B2.01.0. <br />4. Pre -Construction Conference: Participate in a Pre -Construction Conference prior to <br />commencement of Work at the Site. <br />5. Schedules: Receive, review, and determine the acceptability of any and all schedules that <br />Contractor is required to submit to Engineer, including the Progress Schedule, Schedule of <br />Submittals, and Schedule of Values. <br />6. Baselines and Benchmarks: As appropriate, establish baselines and benchmarks for <br />locating the Work which in Engineer's judgment are necessary to enable Contractor to <br />proceed. <br />7. Visits to Site and Observation of Construction: In connection with observations of <br />Contractor's Work while it is in progress: <br />a. Make up to three (3) visits to the Site at intervals appropriate to the various stages of <br />construction, as Engineer deems necessary, to observe as an experienced and qualified <br />design professional the progress of Contractor's executed Work. Such visits and <br />observations by Engineer, and the Resident Project Representative, if any, are not <br />intended to be exhaustive or to extend to every aspect of Contractor's Work in progress <br />or to involve detailed inspections of Contractor's Work in progress beyond the <br />responsibilities specifically assigned to Engineer in this Agreement and the Contract <br />Documents, but rather are to be limited to spot checking, selective sampling, and similar <br />methods of general observation of the Work based on Engineer's exercise of <br />professional judgment, as assisted by the Resident Project Representative, if any. Based <br />on information obtained during such visits and observations, Engineer will determine in <br />general if the Work is proceeding in accordance with the Contract Documents, and <br />Engineer shall keep Owner informed of the progress of the Work. <br />b. The purpose of Engineer's visits to, and representation by the Resident Project <br />Representative, if any, at the Site, will be to enable Engineer to better carry out the <br />duties and responsibilities assigned to and undertaken by Engineer during the <br />Construction Phase, and, in addition, by the exercise of Engineer's efforts as an <br />experienced and qualified design professional, to provide for Owner a greater degree of <br />confidence that the completed Work will conform in general to the Contract Documents <br />and that Contractor has implemented and maintained the integrity of the design concept <br />of the completed Project as a functioning whole as indicated in the Contract Documents. <br />Engineer shall not, during such visits or as a result of such observations of Contractor's <br />Work in progress, supervise, direct, or have control over Contractor's Work, nor shall <br />Engineer have authority over or responsibility for the means, methods, techniques, <br />sequences, or procedures of construction selected or used by Contractor, for security or <br />safety at the Site, for safety precautions and programs incident to Contractor's Work, <br />Page6 <br />(Exhibit A — Engineers Services) <br />EJCDC E-600 Agreement Between Owneand Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />