My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - American Structurepoint Inc - Pinhook Water Treatment Plant
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - American Structurepoint Inc - Pinhook Water Treatment Plant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:59:36 PM
Creation date
3/27/2019 1:48:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: DF6AA6FA-1DAD-4DBC-9195-DC507E7C3EB9 <br />This is EXHIBIT A, consisting of 13 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated March 12, 2019. <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below.. <br />The City of South Bend (Owner) intends to complete the rehabilitation of the Pinhook Water Treatment <br />facility and hereby enters into contract for engineering services with American Structurepoint, Inc. to <br />provide planning, design, and construction administration services to complete this program. The projects <br />include the following major components: <br />1. Potential replacement of Well 3. <br />2. Rehabilitation of filter systems including underdrain systems, filter media, hydraulic control, <br />valves, and electric actuators. <br />3. Rehabilitation or Replacement of High Service Pumps. <br />4. Instrumentation and Controls Improvements. <br />5. Backup Power assessment. <br />PART 1— BASIC SERVICES <br />A1.01 Project Kickoff <br />A. Engineer shall: <br />1. Conduct an in -person project kickoff meeting with Owner. <br />2. Participate in facility tour with Owner and operations staff. <br />3. Prepare and distribute meeting notes capturing Owner goals, deficiencies of existing <br />systems, equipment and layout preferences, operations and maintenance (O&M) <br />considerations, information request, communications protocol and detailed project <br />schedule. <br />4. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer's Basic Services. <br />A1.02 Basis of Design Memorandum Phase <br />A. Engineer shall: <br />1. Collect and review Owner -provided information upon receipt. This may include, but is not <br />limited to, relevant information such as plant as -built drawings, equipment information, <br />Pagel <br />(ExhibitA —Engineers Services) <br />EJCDC E-500 Agreement Between Owneend Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.