My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Main & Jefferson Earthwork Project No 119-022 - Michels
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Main & Jefferson Earthwork Project No 119-022 - Michels
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:56:50 AM
Creation date
3/27/2019 1:41:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MICHELS CORPORATION - STATEMENT OF QUALIFICATIONS <br />required by the Contract. Michels uses a team approach to quality control. Members of the <br />Michels Quality team include: <br />• Michels Quality Manager <br />• Quality Control Representatives (QCR). <br />• Michels project management, supervisory, design, and administrative personnel provide <br />in kind support of the QA Plan and the QC activities. <br />• Crew foremen or leads <br />Our Quality culture is reinforced and driven downward by upper management. <br />7.4 Quality Department <br />To maintain operational integrity, the Quality Department reports independently to the Senior <br />Vice President, rather than to divisional management. <br />The Michels Quality Department is staffed with a core group of highly certificated professionals <br />that are committed to Quality. They are SMEs in their specific disciplines, and cross trained and <br />possess certifications in many other disciplines. Many are graduates of RAB QSA (now <br />Exemplar Global) Lead Auditor Training. While each of these personnel maintains an elevated <br />certification in at least one discipline, they all have additional certifications, and extensive <br />construction experience. All of these personnel communicate well with all others of the Quality <br />group, availing each to the combined composite knowledge and experience of the entire group. <br />Michels Quality Department is responsible for all aspects of Quality Assurance and Quality <br />Control. The Quality Assurance group provides the training, tools, and techniques to achieve the <br />quality expectations in accordance with project specifications and standards. Quality Control <br />activities focus on inspecting, auditing, and confirming that the quality requirements are being <br />consistently fulfilled, and auditing the construction activities to ensure the integrity and continual <br />improvement of work processes and conformance. Michels strives to continually improve the <br />effectiveness, efficiency and repeatability in which projects are delivered, with concentration on <br />turning over completed projects meeting or exceeding customer expectations in performance <br />and life cycle costs. <br />8 Equipment <br />8.1 Fleet Overview <br />Michels is proud to own and operate one of the newest, largest and most dependable fleets in <br />the industry. With more than 10,000 pieces of major equipment, Michels has the equipment <br />necessary to get the job done on time and in the most demanding conditions. In addition to <br />common construction equipment such as backhoes, bulldozers, bucket/line trucks and <br />excavators, Michels also owns hard -to -find specialty items, including Kobelco CK160OG and <br />Manitowoc MLC300 series crawler cranes and custom -designed -and -built directional drill rigs. <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.