My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-14-12 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2010-2019
>
2012
>
06-14-12 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2012 2:44:43 PM
Creation date
7/30/2012 2:44:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br /> Regular Meeting—June 14, 2012 <br /> 6. NEW BUSINESS (CONT.) <br /> A. South Bend Central Development Area <br /> (1) continued... <br /> rains the water flows back into the store. <br /> Both walls and floor need to be repaired and <br /> a drain needs to be installed to remedy the <br /> problem. The estimated cost is $1,500. Staff <br /> asks approval from the Commission. <br /> Upon a motion by Mr. Varner, seconded by COMMISSION AUTHORIZED REPAIRS AND <br /> Mr. Alford and unanimously carried, the INSTALLATION OF A DRAINAGE SYSTEM NEEDED <br /> Commission authorized repairs and IN FRONT OF RETAIL SPACE AT 117 S.MICHIGAN <br /> STREET. <br /> installation of a drainage system in front of <br /> retail space at 117 S. Michigan Street. <br /> Ms. Jones asked if the drainage system will <br /> be flush. Mr. Inks responded yes that a slit <br /> trench drain that will be installed. <br /> (2) Proposal for survey services to write legal <br /> descriptions related to Niles Avenue sewer <br /> separation project right of way. <br /> Mr. Relos noted that Abonmarche has <br /> submitted a proposal to prepare legal <br /> descriptions for two pieces of right-of-way <br /> that are needed for completion of the Niles <br /> Avenue sewer separation project. These <br /> legal descriptions effect small slivers of the <br /> Troeger site, which the Commission sold for <br /> development of ten townhomes with river <br /> views. <br /> The two pieces of right of way are located: <br /> • At the bend of Niles Ave near <br /> Jefferson; an easement is needed to <br /> allow an electrical line that connects <br /> to the hydropower generator near the <br /> head of the East Race. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.