<br />Board met Pin regular, session at '10: 00 A.M.. All members oresent.
<br />Bids were received opened and read for the pipe sewers in Edgewater -
<br />Place Addition as follows.:
<br />B id of .Bruno De P eape
<br />cas -iron
<br />t 9. o0
<br />15 " inch pipe sewer, per lin ft.•••..••..:..........:..
<br />151nch pipe sewer,. per 1in;ft......... ............: ... 2.10
<br />12 inch pipe sewer, perjin ft.. ...................... 1.95
<br />10 inch pipe sewer,:per lin,ft............ ,,.....;•...... 1.85.
<br />8 inch pipe sewer,, per lin ft........................, .. 080 ..
<br />6 inch pipe sewer, -per lin ft. ....:.•............... .85
<br />Manholes, per -tin .ft. in depth....._....... �.......:.......... 7,00
<br />Manholes, curbs and cover-s,,eagh........... ..,.,•;....; 18.00
<br />Storm, water, inlets,,...each......10.00
<br />Check 010 0.06
<br />Bid of L. ' H. ':Webster.
<br />16 inchcplpeisenwer, per-lin ft.......•_................... 9.00
<br />15 inch pipe sewer, per lin ft........ ................:.. 3.00
<br />12 inch pipe sewer, per lin Ft. �..............:......... 1.90
<br />10 inch.pipe sewer, -per lin ft.....:................•.• 1.50
<br />8 inch pipe sewer, per l in ft......................... • 70
<br />.6 inch jiipe sewer, per lin ft...................':..:.. .804
<br />14-12- 6-2 Ys. each ..............:................:... 21.00
<br />:Iron pegs 2 X 8 ft....:..•,.............................. 6.00
<br />- Manholes, per ft. in depth....•.•••••..•.•.••,• - 6.00
<br />Manholes, curbs and covers, each ........................ 18.00
<br />.Storm water inlets,, each .......... .................•..... 9.00
<br />Check for $100.00
<br />Bid of Goo. A. Harrop
<br />15 ditch pipe sa-wer -'__ �, per lin ft..................... 2.60
<br />12 inc;o .'ip Q ewer = e? -r .1 in ft ..................... • ... 2.20
<br />10 inch pipe sewer, per lin ft........................ 1.90
<br />8 inch pipe sewer , per lin ft..................:.... .60
<br />(I inch pipe sewer, per lin ft......................... .80
<br />16 inch cast iron pipe, per lin ft..................... 7.50
<br />Extra 12 X 6 Y's each......... ........ 1.60
<br />Manholes, per ft. in depth ......................... . .. . 5.50
<br />Manholes, curbs and cover,3, each ....................... 18.00
<br />Storm water inlets, each...... ........................... 10.00
<br />Check for $100.00
<br />All of the above bids were referred to the City Engineer for tabulation
<br />to be reported back Wednesday April 9th.,1919 at 7:15 P.M.
<br />The following waiver signed by Whitcomb and Keller and read and pieced
<br />on f it a by the Board. W A I jI E R.
<br />To the Board of Publ c Works of the
<br />South Bend, IndIana.
<br />South Bend, Indiana April 4th.
<br />1919 -
<br />WHEREAS, the Board of Public Works of the City of South Bend,
<br />Indiana, did, on the 4th., day of April 1919 did adapt a preliminary resolution
<br />for the improvement of Monroe Street, Edgewater Drive,, River Avenue and Arch
<br />Ave. in Edgewater Place Add it ion in the City of South Bend, In by the con-
<br />struction of a sewer system. Also the construction of the necessary manholes,
<br />and inlets, water inlets, conduits, and resetting all manholes and inlets to the
<br />proper grade. All as shown on the plans, and in accordance with the profiles,
<br />detail drawings and specifications on file in the office of the Department of
<br />Public Works.