My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 3010 approving/authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Nimtz Parkway Multi-Use Path, Phase 1 Engineering Supplement #1)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 3010 approving/authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Nimtz Parkway Multi-Use Path, Phase 1 Engineering Supplement #1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 9:07:02 PM
Creation date
7/20/2012 10:58:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />June 2 2. 2011 <br />City gl'South Bend <br />Proposal, for Engineering Services <br />Ninil_ Parkway Multi -use Path Page 2or3 <br />(h) Submit preliminary field check plans to the City; <br />(i) Attend field check meeting with the City; <br />(j) Revise the preliminary plans from the preliminary field check meeting; <br />(k) Finalize landscape and intersection details; <br />(1) Prepare a sign plan and sign summary; <br />(m) Develop erosion control plans and permit; <br />(n) Calculate project quantities including earthwork using the cross sections; <br />(o) Prepare the project special provisions and specifications; <br />(p) Final design of path lighting plan; <br />(q) Submit the final plans and special provisions for the City; <br />(r) Revise the final plans and special provisions per the City review; <br />(s) Revise the cost estimate; <br />(t) Revise the special provisions; <br />(u) Submit the tracings and special provisions to the City for biddiM ) <br />A Geotechnical Investigation will be provided by the City if necessary. Any right -of- <br />way engineering services will be an additional service. <br />Task 43: Bid Period <br />(a) Attend the pre -bid meeting; <br />(b) Answer bidding questions; <br />(c) Prepare necessary addendums to the contract bid documents; <br />(d) Attend bid opening and the tabulate bids. <br />Task #4: Construction Period <br />(a) Attend pre - construction conference; <br />(b) Answer City, Contractor, and public questions from the field; <br />(c) Review shop drawings and check construction compliance in accordance with the <br />contract document; <br />(d) Attend field progress meetings as required by the City. <br />Engineers Planners Architects S U f VeV0rs <br />
The URL can be used to link to this page
Your browser does not support the video tag.