My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 3010 approving/authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Nimtz Parkway Multi-Use Path, Phase 1 Engineering Supplement #1)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 3010 approving/authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Nimtz Parkway Multi-Use Path, Phase 1 Engineering Supplement #1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 9:07:02 PM
Creation date
7/20/2012 10:58:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 22, 2011 <br />City gl'Sowh Genet <br />Proposal for Engineering Sen -ices <br />Nimh Parkwav Multi-use Path Page 1 of 3 <br />APPENDIX "A" <br />Work Plan <br />PRQJl +_%-_:T SCOPE <br />The proposed project consists of the desigl and development of bid documents for the <br />construction of a multi -use path 8 feet in width from the entrance to Blackthorn Golf Course <br />to the west side of Mayflower Road over a distance of 4,400 feet. A rest area will be <br />developed near the golf course 15t1i tee. <br />This project will require field survey, roadway design and landscape design_ The topographic <br />survey will survey the area from the south and east curb line to the (.xisting right-of-way line in <br />the areas that were not surveyed previously for the Mayflower Se« er Project. Lighting for the <br />path will be designed to mount on the path side of the existing light poles. <br />SCOPE OF SERVICES <br />The scope of services proposed herein includes the design and development of bid documents <br />for the project and are further described as follows: <br />Task #1: Field Surrey <br />(a) Obtain recorded plats, deeds of all adjacent properties, and section line documentation; <br />(b) Obtain utility maps for all of the utilities in the existing right of way; <br />(c) Establish the existing right of ways and set construction control lines. Witness survey <br />horizontal control points; <br />(d) Run benchmark levels circuit setting temporary benchmarks no further than 500 feet <br />apart., <br />(e) Obtain location of existing manholes, storm water inlets and rater valves. Detail <br />measure existing manholes to get inverts and sewer sizes; <br />(f) Locate existing utilities that are in the right of ways; <br />(g) Obtain topographic data; <br />(li) Plot the topographic survey and develop existing contours. <br />Task #2: math. Design <br />(a) Prepare plan and profile sheets from the topographic survey; <br />(b) Develop proposed typical sections; <br />(c) Design proposed grades and geometrics; <br />(d) Plot existing and proposed cross sections in all areas at intervals of 50 feet; <br />(e) Design the rest area; <br />(f) Prepare preliminary estimate of probable construction costs; <br />48 (g) Prepare maintenance of traffic plan and construction staging sequences; <br />Engineers Planners Architects Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.