My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/12/1918 Board of Public Works Special Meeting Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1918
>
08/12/1918 Board of Public Works Special Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:49:26 PM
Creation date
2/14/2019 12:32:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/12/1918
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 6 g <br />Boexd met in special session At 1:30 P.M. All members present. <br />The matter of condition of rant LaSalle Avenue sewer between <br />Notre Dame Avenue and St. Peter Street, in regard to repair of same as per contract <br />let to Bruno De Peape was discussed by the Board with the City Engineer. Mr. Bruno <br />DePaepe having contract for repair of same appeared before the. Board and explained <br />about the c and it ion of the sewer and it was mutually agreed that both parties agree <br />to release each other from the contract as per the following release. <br />R E L E A S Be <br />This agreement made this 12th., day of August 1918 between the City <br />of South Bend by and thr=g1r its Board of Pub1 ieWorks party of the first part and <br />Bruno De Pkppe- of `uSouth BBend, party of the second part. <br />WITNESSETII: <br />Wheread, said first party did on the 16th., day of July 1918 let <br />a certain public improvement contract to.said Brunei De Peape, party of the second <br />part to relau the. sewer on East La Salle Avenue between St.'Peter Street and Notre <br />Dame Avenue in the City of South Bend, and Whereas, said parties hereto are willing <br />to proceed with said contract, but the condition of said sewer make the carrying <br />out of said contract useless and the contractor reports that my further work that he <br />might do would be of no value. <br />NOW THEREFORE; <br />Each of said parties hereto mutually release each otherfrom <br />any liability -under any of the terms of the contract. It is further agreed that , the <br />contractor will stop work as ofthis date, leave all materials in their present <br />conditions and that the City of South Bend will relief the contract from any future <br />l iab it ity under any City Ordinance for the guarding of any dpenings in the streets. <br />IN WINTESS WHEREOF, the parties hereunto set their hands and seals <br />this.l2th., day of August 1918. <br />BOARD OF PUBLIC WORKS, <br />BY G. A. ELLIOTT <br />BRUNO DE PEAPE.. <br />It is further agreed that the Board of Public Works will allow <br />Bruno De Peape the sum of 50 cents ($.50) per day from this date for the use of the <br />material as it stands on the job until a contract i '. lot for the installing of said <br />sewer. <br />The Board adopted the following Trunk sewer. <br />TRUNK SEWER IMPROVEMENT RESOLUTION NO. 583. <br />RESOLVED BY THE BOARD OF PUBLIC WORK OF THE CITY OF SOUTH BEND, <br />COUNTY OF ST. JOSEPH, STATE OF Indiana, That is desired and deemed necessary to <br />construct a sewer in La Salle Avenue from the alley east of St. Louis Blvd. to the <br />alley east of St. Peter Street, all in said City, which, from its size and character, <br />is.not only intended and adapted for use by property owners whose property abuts <br />along the line of said sewer, but is klos intended and adapted for receiving <br />sewage from collateral drains already constructed or whisk may be hereafter con- <br />structed, and the same is hereby ordered constructed inand along the following <br />line in said City, to -wit: - <br />Beginning at the intersection of the center line of the <br />First alley east of St. Louis Boulevard and La Salle Avenue; thence east along the <br />center line of La Salle Avenue to the first alley east of St. Peter Street with an <br />18 inch vitrfied pipe sewer. Together with the necessary manholes, storm water <br />inlets, and conduits. Existing house connections shall be connected with the new <br />sewer along the line of said improvement, all as is more particularlly shown and all <br />In accordance with the plans, profiles, detail drawings and specifications an file in <br />the office of the Department =of Public Works of the City of South Bend, Indiana. <br />And to be built in accordance with the profiles, specifications <br />detail plans, maps and estimates now on file in the office of the Department of Public <br />Works of said City, which includes an estimate of the proportion that the cost of an <br />
The URL can be used to link to this page
Your browser does not support the video tag.