My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/02/1918 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1918
>
04/02/1918 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:21:44 PM
Creation date
2/14/2019 9:45:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/2/1918
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />4 <br />Bid of Hoban & Roach. <br />Grading per cu. yd. •.90 <br />curbing per lin ft. .35 <br />Creoseted Wooden Block 4.10 <br />Resurfacing an old concrete base. 3.30 <br />Concrete under Street Railway track per sq. yd. 6.00 <br />8 " conduit per 'lin ft. 1.00 <br />Marginal curb, per tin ft. .25 <br />Resetting islets, each 2.00 <br />Resetting manhole covers, each 2.00 <br />U <br />o <br />PAVEMENT IMPROVEMENT ON BLAINE AVENUE from LA PORTE AVENUE TO <br />LINCOLN WAY WEST. <br />Bid of Harry N.' Barnes. <br />C etn.ext curb, per. lin ft. <br />$ .30 <br />grading per cu. yd. <br />.80 <br />Ironstone per cu. yd , <br />1.90 <br />Veedersburg per sq. yd. <br />1.90 <br />Add 12 cents per sq. yd. if cement filler be used <br />.12 <br />8". conduit per fix ft. <br />.60 <br />Storm water islets, complete <br />6.00 <br />Marginal curb per lin ft. <br />.20 <br />Resetting: ial eta, each <br />2.00 <br />Resetting manhole, covers, each <br />2.00 <br />Bid of the ' WhiVe Construction Company. <br />Walk per sq. ft. <br />.14 <br />cement curb, per fin ft. <br />.33 <br />gied ing per cu. yd. <br />f85 <br />Trinidad Lake Asphalt per sq.'yd. <br />2.22 <br />Asphaltie concrete using Trinidad Lake Asphalt <br />1.99 <br />8 ," conduit per lin, ft. <br />.86. <br />Steorm water inlets complete <br />8.00 <br />Marginal curb, perlin in ft. <br />.33 <br />Resetting islets, each <br />2.00 <br />Resetting manholes, corners, -etc., each <br />2.00 <br />Bid of the Western Construction Company. <br />Cement curb., per tin ft. <br />.30 <br />Grading per cu. yd. <br />.80 <br />Trinidad Lake .Asphalt per sq. 7d. <br />2.10 <br />Asphaltic ceacroto pavement peer sq, yd. <br />1.93 <br />8' c-enduit per lin ft. <br />.85 <br />Stsbrm water inlets, each. <br />8.50 <br />Marg isal curb, per lin 'ft. <br />.30 <br />Resetting islets, each <br />2.00 <br />Resettiag manhole, covers, eaek.' <br />9.00 <br />Bid of Williston Construction Co. , <br />Celuent curb, periia tt. .35 <br />Grading per cu. yd. .77 <br />Asphalt per sq. yd. 2.18 <br />Asphaltic concrete per sq. yd. 2.03 <br />8" 0enduit per lie ft. .83 <br />Storm water inlets, each 8.00 <br />Marginal curb, per 1 in ft. .35 <br />Resetting inlets each 2.00 <br />Resetting menh®1as, coveraa, each 2.00 <br />Bid of H. N. Barnes on Repairs of sidewalks an Various Streets is City. <br />Walk per sq. ft. .15 <br />curb, per l ix ft. .35 <br />grade per cu. yd. .70 <br />All of the above bids were roterred to the City Civil Engineer for <br />tabulatioato be reported on at 9.00 A.M. Wednesday April 3rd.,1918. <br />
The URL can be used to link to this page
Your browser does not support the video tag.