My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/02/1918 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1918
>
04/02/1918 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:21:44 PM
Creation date
2/14/2019 9:45:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/2/1918
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Street <br />Bid of <br />Board met. in regular session at 10:00 A.M. All members present. <br />Bids were received, opened and read on the follwing improvements. <br />° Pavement. ®a Jefferson Blvd. from <br />E. line <br />of Michigan <br />to west line of the Bridge` over .the St. Joseph River. <br />The White Construction Company. <br />Cement walk. -per sq. fit. <br />$.14 <br />Cement curb per tin ft. <br />.33 <br />Grading per cu., yd. <br />.85 <br />2.35 <br />Tri aidad Lake Asphalt on concrete base per <br />sq. yd. <br />Trinidad 'Lake Asphalt resurfaee per sq. yd. <br />1.58 <br />Veedersburg Brick black per' sq. yd. <br />3.00 <br />Veedersburg Brick, resurface per sq. yd. <br />1.95 <br />-Concrete Stretcher per lin ft. <br />•20 <br />Extra concrete per cu. yd. <br />7.00 <br />Uo#btsr cushiax per sq. yd. <br />.20 <br />Granite Stretcher per lin ft. <br />.60 <br />8 " c'eaduit pipe per lin ft. <br />.86 <br />Storm water inlets. <br />8.00 <br />Marginal curb, per lin ft. <br />.33 <br />Resetting inlets. <br />2.00 <br />Resetting Manhole covers <br />2.00 <br />Bid of the Williston C oustruct ion Company. ° <br />cement curb per lin ft. <br />grading per cu. yd. ° <br />Asphalt roadway per sq. yd <br />Brick pavement got in car tracks per sq. <br />asphalt pavemeatResurfac isg pavement on old base per sq. <br />Brick pavement resurfacing on old base <br />Mortar cushion per sq. yd. <br />Extra concrete per cu. yd. <br />Stretcher block on car track granite per <br />8" conduit per lin ft. <br />Storm -water inlets <br />Marginal curb, per tin ft. <br />Resett ing inlets <br />Resetting manhole covers <br />Bid of the Western Construction Company, <br />yd. <br />yd. <br />1 in ft.. <br />Grading, per cu. yd. <br />Trinidad Lake Asphalt per sq. yd. <br />Asphalt resurfacing per sq. yd. <br />Ironstone or Veedersburg No. 1. per sq. yd.. <br />in car tracks. <br />Brick resurfacing per sq. yd. <br />Morter cushion for brick pavement per sq. yd. <br />Granite stretcher block per tin ft. <br />Concrete stretcher Der lin ft. <br />Extra concrete per cu. yd. <br />For extra concrete per cu. yd. in car tracks <br />8" conduit per lin ft. <br />Storm water inlets <br />Marginal curb, per lin ft. <br />Resetting inlets each <br />Resetting manhole covers each <br />B id of H. H. Barges. ° <br />Curb per lin ft. <br />Grad ing per cu. yd <br />Creosoted Wooden Block per dq. yd. <br />Creeseted Wooden Block an old .concrete per sq. <br />82 coaduit per lin ft. <br />Storm water inlets, comvlate <br />Marginal curb per li.a ft. <br />Resetting inlets each <br />Resetting manhole covers each ° <br />yd. <br />.35 <br />•77 <br />2.34 <br />2.94 <br />1.63 <br />2.00 <br />.25 <br />7.00 <br />20 <br />.83 <br />8.00 <br />.35 <br />2.00 <br />2.00 <br />. 30 <br />2.32 <br />1.53 <br />2.97 <br />1.88 <br />.25 <br />.55 <br />. 20 <br />6.50 <br />6.50 <br />.85 <br />8.50 <br />. 30 <br />2.00 <br />2.00 <br />. 4o <br />.80 <br />4.29 <br />3.6o <br />6.00 <br />.20 <br />2.00 <br />2.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.