My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/26/1918 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1918
>
03/26/1918 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:21:11 PM
Creation date
2/14/2019 9:33:47 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/26/1918
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V? I <br />Board. met. in: regular. session at- 10:00 A.M. All members present. <br />B ids were received opened and read on the full•wing. <br />Bid of Alex H. Croutzberg. <br />Will recover Frames of awnings at $7.50 each. out of Brown <br />and whit*,, same to be aceeoted in weak or ten days. Reduction for putting up until <br />awnings are hung. <br />B id of South Bend Aug Company. <br />We propose to reeevtr the 8 awning frames which mead ,recovering for <br />$ 5.25 each using same stripe as formerly. <br />We further propose recovering and properly Fitting the 8 awnings for <br />6.40 each. We make this second proposal as the awnings as made are not right and <br />do not give the protection for which they are intended. Will rehang other awnings for <br />$.25 each. <br />We .propose to remodel and recover with same material as Former cover <br />on all windows having a transom and run Frame above transom For $7. 00 The above lo► id <br />is amended. <br />South Bend Awhing Company, <br />R.C.T. <br />The Board awarded the contract to the South Bend Awning Company <br />at the above price, the Janitior is the City Hall to see that those awnings are of the <br />same material ,and that same are properly hung and have the bill o. k. by janitor before <br />bill for same is rendered .to Board for payment. <br />Petition roe e ived far narrowing Bartlett Street from curb to curb 5 foot. <br />Slame referred to the City Engineer For report. <br />Street Commissioner D. C. Layton reported to the Beard of the condition <br />of sower from roots of trees, at the Corner of Notre Dame Avenue and Washington Avenue. <br />The Board ord_ red the Street Commissioner to notify property owners to remove treess at <br />once. <br />Petition received for asphalt pavement on Bartlett Street From Michigan <br />Street to Lafayette Street. The same read and referred to the City Engineer for a <br />r e port-. <br />Communication received and read and placed on file from J. R. Jackson <br />Roc . Secretary of the South Bend Building Trades Council, in regard to City to use <br />union labor on City Hall remodeling. <br />The Pole and Wire inspector reported on the Following complaints. <br />Indiana & Michigan Elea. Co., ordered to move pole seven (7) foot <br />which is in the way of garage building at 451 Lincoln Way East. <br />South Bend Home Tel. Company notified to reset pole owned by their <br />company -and used jointly by jrheir company with the Indiana & Michigan Elea. Co. <br />at 451 Lincoln Way East. <br />Central Union Tel. Company instructed to move guy wire which stands in <br />the way of garage doorway at 817 So. Chapin Street, as there is onw more pone to the north <br />of this guy wire which will hold the line in position alright by placing the guy wire at the <br />next pole to the north. <br />Also pelt which is in way of building of garage at 332-334 So. Taylor <br />Street at corner of Division Street ordered removed to the north to the dividing line <br />between the two sots. <br />Street Commissioner reported on petition an repairing of South Mich. <br />Street -pavement. <br />To the Hon. Board of Public Works, <br />Gent lemen:- <br />I have personally investigated the attached request; The Street Dept., is not <br />equipped nor has it a fund sufficient to rebuild a street. It would mean to thoroughly <br />scarify the old stone and add 5 or 6 carload of -large stone, thoroughly rolled then add <br />small stone and dust to fill voids and rolled again then a carpet coat of asphalt oil <br />and sand, ( Would recommend just filling ruts this year.) As for road oil non can be obtained <br />Tke rebuilding of South Michigan Street could not end of Pairviaw Street as petition reads, <br />Very respectfully, <br />D. C. LAYTON,Street Commissioner. <br />The above report was approved by the Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.