My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Frost Engineering & Consulting - Flood Damage Repairs at North Pumping Station
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - Frost Engineering & Consulting - Flood Damage Repairs at North Pumping Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:10:24 PM
Creation date
2/12/2019 4:10:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of 2/12/2019 <br />("Effective Date") between <br />Boar(l of Public Works. City of South l3crid. Indiana ("Owner") and <br />Frost Engiineering &-Consulting '("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />City of South Bend- North Pumping Station ("Project") <br />Engineer's Services under this Agreement are generally identified as follows: <br />Phase IB-$13,450.00 <br />Phase 2 - $29,500.00 <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period of&) -Wee <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or iF required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services asset forth in <br />Paragraphs 7.01 and 7.02. <br />B. Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: LlmonthyL. <br />C. If the Project includes construction -related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete <br />construction not exceeding 4_ months. If the actual time to complete construction exceeds the <br />number of months indicated, then Engineer's period of service and its total compensation shall be <br />appropriately adjusted. <br />r;igc I <br />I:J('I)C E-500 Agrecmem Belneen Owner and Elloillm. rot. Professional scrsices <br />Cops right © 2003 \alional socich` of P ofessional Enginccl s for I JCUC. All l ghts resencd. <br />
The URL can be used to link to this page
Your browser does not support the video tag.