Laserfiche WebLink
PHASE 2: PROFESSIONAL ENGINEERING SERVICES — CONSTRUCTION PLANS AND <br />SPECIFICATIONS FOR REPAIRS <br />Frost Engineering will work with the City of South Bend and prepare a bid package for <br />repairs to the exterior sidewalk, interior demolition of 6" slab above pipe & <br />repointing identified in Phase 113. For new items found outside these repairs, Frost <br />Engineering will work with the City to identify any new tasks to be included in <br />development of the final construction plan set. <br />Frost Engineering will take the data from known findings from Phase 1A and any new <br />findings in Phase 1B & develop engineering construction plans and specifications for all <br />identified deficiencies. This will include an excavation to the lower exterior wall. iust above <br />foundation footing, and resetting/compacting the sub -surface and will include repairs to <br />the damaged sidewalks. Repointing of the wall, prior to resetting the adjacent soil will be <br />included. Plans will include trenching and provisions for safety of the trench during work <br />Plans and specifications will also note/outline internal repointing of the lower space <br />Norther and Western walls. Plans will also note repointing of the western window arch <br />area. This will also include preparation of a bid package for the City. <br />PHASE 3: PROFESSIONAL ENGINEERING SERVICES — CONSTRUCTION OVERSIGHT <br />Frost Engineering will provide the design engineer for questions and comments <br />during bidding and during construction, as necessary. <br />A registered Professional Engineer (PE) in the State of Indiana will oversee the bidding and <br />provide field construction over -sight, if requested from the City of South Bend. <br />NTE TOTAL <br />This is a quotation on the goods named, subject to the conditions noted on the following pages: <br />To accept this quotation, sign here and return: <br />THANK YOU FOR YOUR BUSINESSI <br />Phase 2: <br />$29,500 <br />Phase 3; <br />T&M <br />Hourly <br />$42, 950 <br />A registered Professional Engineer (PE) knowledgeable of structural building systems of this type will <br />lead the field inspection, measurements, and field assessment. The same engineer will direct and <br />oversee the development of the final report. This same engineer will direct the repair plans, as necessary, <br />of the structural systems. <br />The schedule for development of plans and specifications is estimated at 4-5 weeks effort. <br />The professional services are for Professional Engineering consulting services. It is understood that the <br />City of South Bend will allow Frost Engineering access to all plans and/or records in its possession and <br />at its disposal pertaining to this work, including all necessary electronic drawings files created in support <br />of the design. Frost Engineering will provide PDF drawing files of all structural plans upon completion for <br />Project Record purposes of the project; however, Frost Engineering and Consulting reserves all rights <br />with regards to these files. <br />Payments will be made from invoices billed monthly based on percent complete. All fees shall be <br />submitted for payment with thirty -day (30) payment of invoices anticipated to maintain our fee structure. <br />-14vO Engineering Et Consulting Company <br />afg,..st novel or CyuaHty a <br />© Copyright 2005. ALL rights reserved. OoauMtm ut to our OWntb <br />