Laserfiche WebLink
Q % hour Travel on site by 9:OOAM / 7-8hr Data collection for building <br />Day 2: <br />• % hour Travel on site by 9:OOAM / 7-8hr data collection for building <br />Any critical deficiencies will be reported immediately <br />A registered Professional Engineer (PE) or Structural Engineer (SE) knowledgeable of <br />inspection, assessment and evaluation of structural systems will lead the field team. <br />Deliverables for this Phase 1 will include an executive report summary of initial field <br />findings, documentation photos, development of Phase 2 scope of work for design for <br />identified repairs. We expect the executive report to be completed in approximately 3 <br />weeks after inspection. <br />Additional engineering support beyond this scope of work can be billed hourly at the rates <br />included in the attached rate schedule (say if beyond 2-day site visit). <br />See Next Page for Demo Phase <br />�ro6t'Engineering Et Consulting Company <br />Highest Level of Quality Q. <br />© Copyright 2005. All rights reserved. Conunitm ut to our CUouts <br />