My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - Black and Veatch Corp - Olive Water Treatment Plant Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 2 to PSA - Black and Veatch Corp - Olive Water Treatment Plant Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:19:59 PM
Creation date
2/12/2019 3:51:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Structural Plans, Sections and Details <br />• Electrical Site, Power Plan and One -Line Diagrams <br />• Instrumentation Diagrams <br />• Technical Specifications including including chemical feed systems, generator, <br />overhead doors, concrete, electrical, instrumentation and functional description <br />Four half-size sets of drawings and specifications will be provided to the Owner at <br />the 50 percent completion milestone for review and comment. The Owner will <br />provide comments to the Engineer within ten days of receipt of the drawings and <br />specifications. A PDF copy of the drawings and front-end specifications will be <br />provided to the Owner for review during the pre -final teleconference. Five half-size <br />sets and 2 full-size sets of the final drawings and specifications will be provided for <br />the Owner's use, as well as a PDF copy of the Contract Documents for bidding <br />purposes. <br />Task 403 — Permits Acquisition Assistance <br />In order to construct the required improvements a Building Permit from the City of <br />South Bend and a Construction Permit from the Indiana Department of <br />Environmental Management may be required. Engineer will assist the Owner by <br />completing permit applications and providing drawings and specifications for <br />permit submittal. The Owner will be responsible for all permit fees and application <br />costs. Additional permit applications can be prepared as a supplemental service. <br />Task 404 — Opinion of Probable Construction Cost <br />The Engineer will prepare an Engineer's Opinion of Probable Construction Cost for <br />the construction of the project. Two preliminary Opinions of Probable Construction <br />Cost will be prepared at the 50 Percent and Final Design deliverables. The final cost <br />opinion will be prepared and delivered to the Owner prior to the Bid opening. <br />Task 405 — Bid Phase Services <br />Owner will place the advertisement of the Invitation to Bid as well as distribute <br />copies of the Bid Documents to prospective Bidders. The Engineer will assist the <br />Owner during the Bid Phase by interpreting the construction contract drawings and <br />specifications. Engineer will lead and prepare for a pre -bid meeting at the Owner's <br />facility as well as prepare a meeting summary for the Owner to distribute. The pre - <br />bid meeting will be attended by the engineering manager. The Engineer will prepare <br />up to one addenda to the Construction Contract Documents for the Owner to <br />distribute, if required. <br />Task 406 — Construction Administration <br />Pages <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.