Laserfiche WebLink
• Instrumentation Abbreviations, Legends and General Notes <br />• Sodium Hypochlorite Bulk Storage Tanks P&ID <br />• Sodium Hypochlorite Bulk Day Tank and Transfer Pumps P&ID <br />• Sodium Hypochlorite Metering Pumps P&ID <br />• Fluoride Bulk Storage and Transfer Pump P&ID <br />• Engine Generator P&ID <br />• Details <br />Contract Documents will be reviewed by senior engineers for quality assurance. <br />The review will cover conformance to standards, completeness, adherence to sound <br />engineering practices, and constructability. <br />Deliverables for the project include: <br />50 Percent Deliverable <br />• Preliminary Civil Plans <br />• Preliminary Mechanical Process Plans <br />• Preliminary HVAC and Plumbing Plans <br />• Preliminary Architectural Plan <br />• Preliminary Structural Plans <br />• Preliminary Electrical Site, Power Plan and One -Line Diagrams <br />• Preliminary Instrumentation Diagrams <br />• Technical Specifications including chemical feed systems, generator, overhead <br />doors, concrete, electrical, instrumentation and functional description <br />• Preliminary Opinion of Probable Construction Cost <br />Final Design Deliverable <br />• Civil Plans, Sections and Details <br />• Mechanical Process Plans, Sections and Details <br />• HVAC and Plumbing Plans, Sections and Details <br />• Preliminary Architectural Plan <br />Page 4 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />