Laserfiche WebLink
teleconference. The project manager and engineering manager and lead chemical <br />engineer will attend the pre -final submittal teleconference. <br />Task 402 — Design and Contract Document Development <br />The Engineer will prepare Contract Documents consisting of drawings and <br />specifications to incorporate a bulk sodium hypochlorite storage and feed system; <br />new fluoride bulk storage tanks; a new generator, HVAC, outdoor shower, and fire <br />protection to support the sodium hypochlorite storage and feed system; new roll -up <br />doors for the fluoride and sodium hypochlorite rooms at the Olive Water Treatment <br />Plant as well as demolition of the existing sodium hypochlorite storage and feed <br />equipment; fluoride bulk storage; and knockout walls for the sodium hypochlorite <br />and fluoride rooms. The documents will be prepared for the selection of a private <br />construction contractor on a competitive bid basis. One contract will be prepared for <br />the performance of all work, including procurement of equipment. The Engineer's <br />Standard Documents will be used for preparation of technical specifications and C- <br />700 Standard General Conditions 2013 Edition will be used with the Owner's front- <br />end documents. <br />A Preliminary Drawing List includes: <br />General <br />• Cover Sheet <br />• Index of Drawings <br />• Abbreviations, Legend and General Notes <br />Civil <br />• Civil Symbology, Legends and General Notes <br />• Site Plan <br />• Civil Details <br />• Erosion and Sediment Control Plan and Details <br />• Demolition Plan and Details <br />Architectural <br />• Architectural Plan and Details <br />Structural <br />• Structural Abbreviations, Legends and General Notes <br />Page 2 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />