My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - Black and Veatch Corp - Olive Water Treatment Plant Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 2 to PSA - Black and Veatch Corp - Olive Water Treatment Plant Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:19:59 PM
Creation date
2/12/2019 3:51:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 8 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 12, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 2 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: June 12 2018 <br />b. Owner: Board of Public Works Cily of South Bend Indiana <br />C. Engineer: Black & Veatch Corporation <br />d. Project: Hydraulic Modeling Training and Olive WTP Improvements Preliminary <br />En ineerin <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />Task 4 — Olive WTP Improvements Design, Bid and Construction Phase Services <br />Engineer will develop contract documents for needed improvements to the sodium <br />hypochlorite and fluoride storage and feed systems as well ancillary support <br />systems at the Olive Water Treatment Plant to maintain a high level of service and <br />safe working environment during normal operation of the treatment facility as <br />documented in the Olive Water Treatment Plant Improvements Preliminary <br />Engineering Report. <br />Task 401 — Project Meetings <br />Engineer will attend up to a total of three project meetings with the Owner. The <br />meetings will be held with the Owner at the Olive WTP in South Bend, Indiana to <br />update the Owner on project progress and obtain feedback on intermediate <br />deliverables. <br />The kickoff meeting will be held with the Owner to discuss the goals and objectives <br />of the project, to establish the lines of communication, as well as gather data <br />necessary to prepare the design documents. One progress meeting will be held to <br />review the design and status of the project at the 50 percent completion milestone. <br />A 2-hour teleconference will be held to review the project prior to final submittal. <br />The kickoff meeting and design progress meeting will be attended at the site by the <br />project manager, engineering manager with the lead chemical engineer attending by <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.