BID/PROPOSAL�.�;
<br />CITY OF SOUTH BEND r
<br />Project Name: Liberty Tower Exterior Renovations mm�mmmmmmm �
<br />.............,
<br />�.
<br />Project Number: 118-086R* i
<br />For Bids Due: January 22, 2019 .... rrw.
<br />Contractor Name: Rieth-Rilev Construction Co.. Inc.
<br />BASE
<br />- ....3......
<br />BID: DIVISION D: SIDEWALK AND CURB
<br />REPLACEMENT
<br />WORK
<br />ON WASHINGTON
<br />-- ST
<br />Surface Milling, Asphalt, 1 '/2IN
<br />117
<br />SYS
<br />$56.00
<br />$6,55200
<br />4
<br />_................_....w
<br />Temporary Inlet Protection
<br />3
<br />EACH
<br />.............._............ _..
<br />$100.00
<br />$300.00
<br />5
<br />...�......
<br />Tree, Remove
<br />..................... ..
<br />3
<br />EACH
<br />$300.00
<br />.�...................................
<br />$900.00
<br />.... ._________________________W.................�_w
<br />6
<br />_w
<br />Sidewalk, Concrete
<br />294 .......
<br />nXmm WWSYS
<br />$120.00
<br />$35,280.00 _.....
<br />7
<br />....._._._............. ..............__....____
<br />Light Pole Foundation
<br />2
<br />EA
<br />...................
<br />$1,580.00
<br />$3,160.00
<br />8
<br />Ornamental Light
<br />2
<br />EA
<br />$2,600.00
<br />$5,200.00
<br />9......._
<br />mXHandhole _
<br />1
<br />EA
<br />$900.00
<br />$900mmm
<br />00
<br />�......1.O.....NO.
<br />4 Wire._ ..... ........
<br />...... 155 ...........LFT
<br />$9.00
<br />$1,395.00.___..
<br />11
<br />NO. 6 Wire
<br />155
<br />LFT
<br />$7.50
<br />$1,162.50
<br />12
<br />Conduit, PVC, 21N, Schedule80 .......
<br />..........a.
<br />150
<br />LFT
<br />$7.00
<br />__......._...............
<br />$1,050.00
<br />13
<br />Construction Engineering g g
<br />1
<br />LS
<br />$8, 560.00
<br />$8,560.00 .._
<br />14
<br />Mobilization/Demobilization
<br />,825.18
<br />$25,825.18
<br />15
<br />---- .. .......
<br />Maintaining Traffic (MOT)
<br />......... .. __.
<br />1
<br />LS
<br />$2,500.00
<br />$2,500.0 0
<br />. _. _......._.......................................................................
<br />16
<br />Concrete Overlaymmmm
<br />26
<br />ITIT
<br />SYS
<br />.__..
<br />$690.00
<br />$17,940.O0mmmmmmmm-
<br />1
<br />17
<br />concrete
<br />Repair of s ailed/delamateddslab
<br />15
<br />� �
<br />SF
<br />$ 500.00
<br />$7,500.00
<br />on bottom of Main St.Entrance
<br />................_...................� _.
<br />18
<br />HMA Base, Type B
<br />9
<br />�
<br />TON
<br />�.........._........................._�
<br />$207.00
<br />w
<br />$1,863.00
<br />19
<br />HMA Surface, Type B
<br />11
<br />TON
<br />$495.00
<br />$5,445.00
<br />21
<br />PCCP For Approach, 6"
<br />............. _.m
<br />92
<br />_......... ........6........_
<br />SYS
<br />$90.00
<br />$8,280.00
<br />22
<br />Curb and Gutter, Concrete
<br />191
<br />LFT _.
<br />_Wmmmmmµ $�35.00
<br />$6,685.00
<br />23
<br />Line, Thermoplastic, Solid, White, 4in
<br />200
<br />LFT
<br />$1.68
<br />$336.00
<br />24
<br />Line, Thermoplastic, Solid, Yellow, 4in
<br />34
<br />LFT
<br />$2.98
<br />$101.32
<br />25
<br />Turn Arrow, Thermoplastic, White
<br />1
<br />EACH
<br />$80.00
<br />$80.00
<br />26
<br />.................w_...............................
<br />Light Standard, Type A
<br />2
<br />EACH
<br />$3,200.00
<br />........... ............ w
<br />$6,400.00
<br />27
<br />Tree Grate
<br />3
<br />EACH
<br />m_......
<br />$3,200.00
<br />$ ._.0
<br />9, 600.00
<br />...................n
<br />28
<br />Ornamental Tree, 2" Caliper
<br />..........................
<br />3
<br />EACH
<br />$625.00
<br />�... ...._
<br />$1,875.00
<br />._....
<br />Additional Exc
<br />avation, cavation,
<br />10
<br />CYS
<br />$40.00
<br />$400.00
<br />Undistributed
<br />30
<br />Utility Allowance
<br />1
<br />..
<br />._ .... ....................
<br />EACH
<br />........... -- ----
<br />$5,000.00
<br />_ �._.................$
<br />_5,000 00
<br />31
<br />Allowance for Sidewalk Conditions
<br />�._. ....
<br />1
<br />.... ---
<br />EACH
<br />$5,000.00
<br />__.$5,QQQ,QO ...
<br />DIVISION D: BASE BID TOTAL __$230,610.00
<br />Version 7/20/2018 Contractor's Bid for Public Works - 9