Laserfiche WebLink
BID/PROPOSAL�.�; <br />CITY OF SOUTH BEND r <br />Project Name: Liberty Tower Exterior Renovations mm�mmmmmmm � <br />............., <br />�. <br />Project Number: 118-086R* i <br />For Bids Due: January 22, 2019 .... rrw. <br />Contractor Name: Rieth-Rilev Construction Co.. Inc. <br />BASE <br />- ....3...... <br />BID: DIVISION D: SIDEWALK AND CURB <br />REPLACEMENT <br />WORK <br />ON WASHINGTON <br />-- ST <br />Surface Milling, Asphalt, 1 '/2IN <br />117 <br />SYS <br />$56.00 <br />$6,55200 <br />4 <br />_................_....w <br />Temporary Inlet Protection <br />3 <br />EACH <br />.............._............ _.. <br />$100.00 <br />$300.00 <br />5 <br />...�...... <br />Tree, Remove <br />..................... .. <br />3 <br />EACH <br />$300.00 <br />.�................................... <br />$900.00 <br />.... ._________________________W.................�_w <br />6 <br />_w <br />Sidewalk, Concrete <br />294 ....... <br />nXmm WWSYS <br />$120.00 <br />$35,280.00 _..... <br />7 <br />....._._._............. ..............__....____ <br />Light Pole Foundation <br />2 <br />EA <br />................... <br />$1,580.00 <br />$3,160.00 <br />8 <br />Ornamental Light <br />2 <br />EA <br />$2,600.00 <br />$5,200.00 <br />9......._ <br />mXHandhole _ <br />1 <br />EA <br />$900.00 <br />$900mmm <br />00 <br />�......1.O.....NO. <br />4 Wire._ ..... ........ <br />...... 155 ...........LFT <br />$9.00 <br />$1,395.00.___.. <br />11 <br />NO. 6 Wire <br />155 <br />LFT <br />$7.50 <br />$1,162.50 <br />12 <br />Conduit, PVC, 21N, Schedule80 ....... <br />..........a. <br />150 <br />LFT <br />$7.00 <br />__......._............... <br />$1,050.00 <br />13 <br />Construction Engineering g g <br />1 <br />LS <br />$8, 560.00 <br />$8,560.00 .._ <br />14 <br />Mobilization/Demobilization <br />,825.18 <br />$25,825.18 <br />15 <br />---- .. ....... <br />Maintaining Traffic (MOT) <br />......... .. __. <br />1 <br />LS <br />$2,500.00 <br />$2,500.0 0 <br />. _. _......._....................................................................... <br />16 <br />Concrete Overlaymmmm <br />26 <br />ITIT <br />SYS <br />.__.. <br />$690.00 <br />$17,940.O0mmmmmmmm- <br />1 <br />17 <br />concrete <br />Repair of s ailed/delamateddslab <br />15 <br />� � <br />SF <br />$ 500.00 <br />$7,500.00 <br />on bottom of Main St.Entrance <br />................_...................� _. <br />18 <br />HMA Base, Type B <br />9 <br />� <br />TON <br />�.........._........................._� <br />$207.00 <br />w <br />$1,863.00 <br />19 <br />HMA Surface, Type B <br />11 <br />TON <br />$495.00 <br />$5,445.00 <br />21 <br />PCCP For Approach, 6" <br />............. _.m <br />92 <br />_......... ........6........_ <br />SYS <br />$90.00 <br />$8,280.00 <br />22 <br />Curb and Gutter, Concrete <br />191 <br />LFT _. <br />_Wmmmmmµ $�35.00 <br />$6,685.00 <br />23 <br />Line, Thermoplastic, Solid, White, 4in <br />200 <br />LFT <br />$1.68 <br />$336.00 <br />24 <br />Line, Thermoplastic, Solid, Yellow, 4in <br />34 <br />LFT <br />$2.98 <br />$101.32 <br />25 <br />Turn Arrow, Thermoplastic, White <br />1 <br />EACH <br />$80.00 <br />$80.00 <br />26 <br />.................w_............................... <br />Light Standard, Type A <br />2 <br />EACH <br />$3,200.00 <br />........... ............ w <br />$6,400.00 <br />27 <br />Tree Grate <br />3 <br />EACH <br />m_...... <br />$3,200.00 <br />$ ._.0 <br />9, 600.00 <br />...................n <br />28 <br />Ornamental Tree, 2" Caliper <br />.......................... <br />3 <br />EACH <br />$625.00 <br />�... ...._ <br />$1,875.00 <br />._.... <br />Additional Exc <br />avation, cavation, <br />10 <br />CYS <br />$40.00 <br />$400.00 <br />Undistributed <br />30 <br />Utility Allowance <br />1 <br />.. <br />._ .... .................... <br />EACH <br />........... -- ---- <br />$5,000.00 <br />_ �._.................$ <br />_5,000 00 <br />31 <br />Allowance for Sidewalk Conditions <br />�._. .... <br />1 <br />.... --- <br />EACH <br />$5,000.00 <br />__.$5,QQQ,QO ... <br />DIVISION D: BASE BID TOTAL __$230,610.00 <br />Version 7/20/2018 Contractor's Bid for Public Works - 9 <br />