Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Liberty Tower Exterior Renovations <br />Project Number: 118-086R <br />For Bids Due: January 22, 201.9.................... _.............. <br />Contractor Name: Rieth-Rilev Construction Co.. Inc. <br />BASE BID: DIVISION A: UPPER LEVEL ROOF WORK <br />­................_ .....................___-.... ........ <br />Item <br />No. <br />Description <br />........ <br />Quantity <br />_....... <br />Unit <br />...�......._................. <br />Total Amount <br />1 <br />New Membrane Roof — 20 Year TPO <br />1 <br />Lump <br />Sum <br />Contingency Allowance for Unforseen <br />1 <br />Each <br />L.. <br />µµConditions ...... <br />_.................................... <br />....__.... <br />-$5,000 <br />3 <br />Contingency Allowance for North <br />1 <br />Each <br />Property <br />$5,000 <br />DIVISION A: BASE BID TOTAL <br />NO BID <br />BASE BID: DIVISION B: EXTERIOR CONCRETE MASONRY REPAIR AND COATING <br />Item No. Description Quantity Unit Total Amount <br />1 Exterior Concrete Masonry Repair and 1 Lump <br />Coating Sum <br />2 Tuck -pointing 400 SF ..... <br />3 Soft Joint Backer Rod and Sealant 1500 LFT <br />4 Cut Control Joints 350 LFT <br />5 Contingency Allowance for Unforseen 1 EACH <br />Conditions $5,000 <br />6 Pro e� _ 1 EACH $5,000 <br />Contingency Allowance for N rth _ ..._ <br />DIVISION B: BASE BID TOTAL NO BID <br />BASE BID: DIVISION C: MAIN FLOOR STOREFRONT AND VESTIBULE ENTRANCE <br />............... .- .... _._.. ........_...... . <br />Item Description Quantity Unit Total Amount <br />No. <br />1 Main floor storefront and vestibule 1 Lump <br />-- ] ------ . . .. . ....................... <br />entrance Sum <br />2 Contingency Allowance for Unforseen 1 EACH <br />Conditions 1 $5,000 <br />DIVISION C: BASE BID TOTAL NO BID <br />BASE BID: DIVISION D: SIDEWALK AND CURB REPLACEMENT WORK ON WASHINGTON ST <br />_............. . .. w ........... _ _..... <br />Item Description Quantity Unit Total Amount <br />No. <br />Pavement Remove 424 SYS $130.00 $55,120.00 <br />...... .............. ............_ ........a._.........�. <br />2 Curb, Concrete, Remove 155 LFT $40.00 $6,200.00 <br />Version 7/20/2018 Contractor's Bid for Public Works - 8 <br />