My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Liberty Tower Exterior Renovations Project No 118-086R - Environmental Glass, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Liberty Tower Exterior Renovations Project No 118-086R - Environmental Glass, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:46:53 AM
Creation date
1/24/2019 8:39:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Elevated ""fork Platforms <br />These rules apply to all erected work platforms. <br />- Structures shall be inspected each day by the user <br />Defects must be corrected before using <br />Each part of the platform shall have the capability of supporting at <br />least 4 times its intended load. <br />Footings must be sound and rigid. Concrete blocks bricks barrels or <br />similar items should not be used as footings <br />Guardrails, mid -rails and toe boards shall be installed on all open <br />sides of platforms <br />- All planking shall be scaffold grade <br />- All planking shall be overlapped and secured <br />- Employees shall not work on slippery elevated platforms <br />- Ladders or safe means of access or egress shall be provided <br />- All scaffolding three sections or higher shall be tied off to a solid <br />support <br />- All bracing, coupling or stacking pins and vertical locking pins should <br />be supply and used in accordance with the manufacturer <br />- Rolling scaffolds shall have wheels lock and choked when in use and <br />shall have proper outriggers installed <br />- No scaffold shall be moved until all equipment is removed and it has <br />no people on it <br />The following is a pre task check list for elevated work areas <br />
The URL can be used to link to this page
Your browser does not support the video tag.