Laserfiche WebLink
Project Forman: <br />Forman's Pre Task Checklist ---Scaffolds <br />Date; <br />Project: Crew Size: <br />Below are the minimum requirements for scaffolds. Use this check list to assure that the <br />scaffolding is safe and the necessary procedures are taken to have an accident free work day. <br />YES <br />NO <br />N/A <br />1.) Does the scaffold have a standard guard rail system with toe guards? <br />2.) Is the scaffold system capable of supporting, without fault, 4 times its <br />Anticipated load? <br />3'.) Is the scaffolding plum and level? <br />4.) Are scaffolds supported by base plates, sills or other adequate <br />foundation? <br />5.) Are working levels fully planked and decked? <br />6.) Is planking overlapped and secured from movement? <br />7.) Do planks extend over the supports at least 6 inches and no more than <br />a foot? <br />8.) Is the planking supported or braced and secured? <br />9.) Has a ladder or safe access been provided? <br />10.) If height applies is scaffolding secured to the structure or wall? <br />11.) Are sections securely connected to each other and braces? <br />12.) Is a guard rail properly in place on all exposed sides <br />13.) Are all employees properly trained <br />14.) Is scaffold tagged appropriately GREEN for good <br />