Laserfiche WebLink
task will be shown on the final construction plans. Specifications will be developed utilizing <br />standard specifications and general conditions provided by the City supplemented (if <br />needed) with CBBEL standard technical specifications. <br />CBBEL staff will provide an opinion of probable cost based on the final construction plans. <br />This opinion will be based on the judgment of CBBEL engineering staff, supplemented by <br />local construction project history information provided by the City. An itemized list of the <br />estimated quantities or work units required to complete the job will be included. <br />It is anticipated that during the progress of this task, CBBEL will meet with the City staff and <br />other necessary local representatives to discuss the progress of the design. Three meetings <br />are included in the proposed fee. We also included coordination with INDOT regarding the <br />Fellows and Ireland intersection. <br />Schedule to complete: 4 Months from approval date <br />Task 2 - Rule 5 Permit: <br />A Rule S permit (IDEM) will be required for this project. CBBEL will prepare the submittal <br />package and required documentation including the publication of a legal notice in a local <br />newspaper. The package will be provided to the City for signature and submittal to IDEM. <br />Schedule: 30 days from completion of final design <br />Task 3 - Bid Services: <br />CBBEL will provide three full copies of the final design documents to the City prior to <br />bidding. CBBEL will assist the City in conducting a pre -bid conference at a location of the <br />City's choosing. CBBEL will address contractor questions and prepare and issue addenda, <br />as needed. Following bid opening, CBBEL will compile and certify bid tabulation sheets and <br />provide a contract award recommendation to the City, it is assumed that City staff or <br />representatives will coordinate the bid collection, bid opening, and the preparation of the <br />construction agreement. <br />Schedule: Assumed 8 week bid period <br />Total Estimated l=ee for Phase 2 is $185,000.00 <br />ESTIMATED FEE <br />If and when the value of work accomplished exceeds 80% of the total estimated fee for each <br />Phase, we will assess the remaining work and will notify you, in writing, if additional <br />compensation will be needed. If additional compensation is needed, we will do no work <br />beyond the total estimated fee until you issue a written notice accepting the additional <br />charges. <br />We will bill you monthly, on a time and material basis, for assigned tasks in accordance with <br />our attached Standard Charges for Professional Services. In addition, our contract will be <br />established in accordance with the attached General Terms and Conditions. These General <br />Christopher B. Burke Engineering Ltd. City of South Bend: Fellows Street Corridor Improvements, Phase it <br />01.12710093.00001 Page 2 of 3 <br />