My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
06-28-12 Packet
>
6E (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:00:40 AM
Creation date
6/25/2012 1:00:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RECEIVED <br />CHRISTOPHER B. BURKE ENGINEERING, LTD. <br />National City Center Suite 1368 South 115 West Washington Street lndiwq)olis, Indiana 46204 TEL (317) 266 -8000 FAX (317) 632 -3306 <br />December 7, 2011 <br />Bill Schalliol <br />City of South Bend <br />Division of Economic Development <br />12th Floor County -City Building <br />South Bend, iN 46601 <br />Subject: Fellows Street Corridor Improvements, Phase 2 - Revised <br />Professional Services Proposal <br />Dear Mr. Schaliiol: <br />Christopher B. Burke Engineering, Ltd (CBBEL) is pleased to provide this revised proposal <br />for professional engineering and planning services related to the Fellows Street Corridor <br />Improvement, Phase 2 project in the City of South Bend. The original contract for Phase 1 <br />was approved on April 28, 2011, Based on the Community Progress Plan and the alignment <br />alternative analysis developed in Phase 1, the attached exhibit is the approved design <br />alignment alternative. The following is our understanding of the assignment, scope of <br />services, and estimated fee in support of the revised Fellows Street Corridor Improvements <br />Phase 2. <br />UNDERSTANDING OF THE ASSIGNMENT <br />CBBEL understands that the City is seeking assistance for the design of the improvements <br />along the Fellows Street corridor as determined in the Community Progress Plan for the <br />Erskine Neighborhood and shown on the attached exhibit. This project will include widening <br />and improving the alignment of Fellows Street and Chippewa Avenue between Ireland Road <br />and Michigan Street. The project will also include drainage improvements along the <br />corridor. <br />SCOPE OF SERVICES <br />Task 1 — Desion Services <br />This task will include the design and preparation of final construction documents for the <br />project. Plans and specifications will be prepared in accordance with City Standards and <br />Specifcabons. <br />Plans will be developed using base sheets created from the topographic survey. The project <br />will consider design features to address the requirements of the regulatory agencies <br />involved with this construction. This task will also include coordination with utility company <br />representatives to identify potential utility relocation needs. information gathered during this <br />Christopher B. Burke Engineering Ltd. City of South Bend; Fellows Street Corridor Improvements, Phase if <br />01.1*110093.00001 Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.