Laserfiche WebLink
South Bend Redevelopment Commission <br />Regular Meeting —June 14, 2012 <br />6. NEW BUSINESS (CONT.) <br />A. South Bend Central Development Area <br />(1) continued... <br />rains the water flows back into the store. <br />Both walls and floor need to be repaired and <br />a drain needs to be installed to remedy the <br />problem. The estimated cost is $1,500. Staff <br />asks approval from the Commission. <br />Upon a motion by Mr. Varner, seconded by <br />Mr. Alford and unanimously carried, the <br />Commission authorized repairs and <br />installation of a drainage system in front of <br />retail space at 117 S. Michigan Street. <br />Ms. Jones asked if the drainage system will <br />be flush. Mr. Inks responded yes that a slit <br />trench drain that will be installed. <br />(2) Proposal for survey services to write legal <br />descriptions related to Niles Avenue sewer <br />separation project right of way. <br />Mr. Relos noted that Aborunarche has <br />submitted a proposal to prepare legal <br />descriptions for two pieces of right -of -way <br />that are needed for completion of the Niles <br />Avenue sewer separation project. These <br />legal descriptions effect small slivers of the <br />Troeger site, which the Commission sold for <br />development of ten townhomes with river <br />views. <br />The two pieces of right of way are located: <br />• At the bend of Niles Ave near <br />Jefferson; an easement is needed to <br />allow an electrical line that connects <br />to the hydropower generator near the <br />head of the East Race. <br />19 <br />COMMISSION AUTHORIZED REPAIRS AND <br />INSTALLATION OF A DRAINAGE SYSTEM NEEDED <br />IN FRONT OF RETAIL SPACE AT 117 S. MICHIGAN <br />STREET. <br />