Laserfiche WebLink
REGULAR MEETING DECEMBER 20, 2018 402 <br />$72,850. Therefore, Ms. Dorau made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD QUOTATION — MORRIS THEATER MEZZANINE HANDRAILS PROJECT NO <br />118-081 (MPAC GENERAL FUND) <br />Ms. Becca Plantz, Engineering, advised the Board that on December 11, 2018, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Plantz recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Larson Danielson Construction Company, Inc., 302 Tyler Street, LaPorte, IN 46350, in <br />the amount of $22,900. Therefore, Ms. Fritzberg made a motion that the recommendation be <br />accepted and the quotation be awarded as outlined above. Ms. Dorau seconded the motion, <br />which carried. <br />AWARD QUOTATION — SOUTH BEND CIVIC THEATER ALLEYWAY REPAVING <br />PROJECT NO. 118-110 (COMPLETE STREETS TRANSPORTATION) <br />Ms. Charlotte Brach, Engineering, advised the Board that on December 11, 2018, quotations <br />were received and opened for the above referenced project. After reviewing those quotations, <br />Ms. Brach recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Walsh & Kelly, Inc., 24358 SR 23, South Bend, IN 46614, in the amount of <br />$50,692.51. Therefore, Ms. Dorau made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD QUOTATION — ORGANIC RESOURCES FACILITY BREAKROOM ADDITION <br />(SEWAGE WORKS OPERATIONS/CONTRACTUAL SERVICES OTHER) <br />Mr. Jacob Klosmski, Utilities, advised the Board that on December 11, 2018, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Klosinksi recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, M&V Pro Services, PO Box 11700, South Bend, IN 46634, in the amount of <br />$41,180. Therefore, Ms. Dorau made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD QUOTATION — COLFAX WATER WORKS BUILDING REPAINTING <br />PROJECT NO. 118-055 (BUILDING REPAIR AND MAINTENANCE) <br />Mr. Scott Kreeger, Engineering, advised the Board that on December 11, 2018, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Kreeger recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Facelift Painting and Powerwashing, 1032 Sussex Drive, South Bend, IN <br />46628, in the amount of $19,153.85 for the Base Bid plus Alternate No. 1. Therefore, Ms. Dorau <br />made a motion that the recommendation be accepted and the quotation be awarded as outlined <br />above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD PROPOSAL — POLICE VEHICLE DECAL DESIGN AND APPLICATION AUTO <br />EQUIPMENT REPAIR & MAINTENANCE FUND <br />In a memorandum to the Board, Division Chief Tim Lancaster, Police Department, stated <br />proposals were received for the above project by the Board on December 11, 2018. Chief <br />Lancaster stated after review, the team is requesting the Board's approval to award the proposal <br />to the highest overall scoring vendor, LNR Graphics, 26174 Lakeview Drive, South Bend, IN <br />46619. Upon a motion by Ms. Dorau, seconded by Ms. Fritzberg and carried, the Board <br />approved the request to award the proposal. <br />REJECT PROPOSAL — INDOT SCHOOL ZONE FLASHING BEACON ASSEMBLIES <br />(INDOT/MAJOR MOVES) <br />In a memorandum to the Board, Mr. Scott Kreeger, requested permission to reject all proposals <br />for the above referenced project due to not meeting the requirement of three (3) letters of interest <br />being received. Therefore, upon a motion made by Ms. Dorau, seconded by Ms. Fritzberg and <br />carried, the above request was approved. <br />APPROVE CHANGE ORDER NO. 1 — GREAT LAKES CAPITAL SPEC BUILDING <br />PAVING — PROJECT NO 118-058 (RWDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Walsh & Kelly, Inc., 24358 SR 23, South Bend, IN 46614, indicating the contract amount be <br />decreased by $113,112.50, plus an additional ten (10) days, for a new contract sum, including <br />