Laserfiche WebLink
REGULAR MEETING <br />DECEMBER 20, 2018 400 <br />0 <br />Total Base Bid <br />$280,000.00 <br />Total Alternate No. 1 <br />$32,000.00 <br />Total Alternate No. 2 <br />$27,000.00 <br />Total Alternate No. 3 <br />$37,000.00 <br />Total Alternate No. 4 <br />$53,000.00 <br />Total Alternate No. 5 <br />$61,000.00 <br />Total Amount Base Bid + Alternates <br />$490,000.00 <br />Upon a motion made by Ms. Dorau, seconded by Ms. Fritzberg and carried, the above bids were <br />referred to Venues, Parks, and Arts and Engineering for review and recommendation. <br />AWARD BID — MCKINLEY AVENUE AND FREMONT PARK IMPROVEMENTS — <br />PROJECT NO. 118-072 (LRSA/UTILITY EXPENSE CONTRACTUAL/VPA) <br />Ms. Alicia Czarnecki, Engineering, advised the Board that on December 11, 2018, bids were <br />received and opened for the above referenced project. After reviewing those bids, Ms. Czarnecki <br />recommended that the Board award the contract to the lowest responsive and responsible <br />bidders: <br />a) Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, IN <br />46614 <br />(1) Amount: $92,017; Division A <br />b) Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46601 <br />(1) Amount: $244,540; Division B and Alternate B1, B2 and B3 <br />Therefore, Ms. Dorau made a motion that the recommendation be accepted and the bid be <br />awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD BID — WASTEWATER TREATMENT PLANT ADMINISTRATION BUILDING <br />MASONRY IMPROVEMENTS — PROJECT NO 118-08_(SEWAGE WORKS <br />OPERATIONS/BUILDING REPAIRS & MAINTENANCE) <br />Mr. Jacob Klosinski, Utilities, advised the Board that on December 11, 2018, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Klosinski <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Ziolkowski Construction, Inc., 4050 Ralph Jones Drive, South Bend, IN 46628 in the amount of <br />$463,380 for the Base Division A, Base Division B, Alternates Al, A3, A4, A5 and B1. <br />Therefore, Ms. Dorau made a motion that the recommendation be accepted and the bid be <br />awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD BID — THREE TWENTY AT THE CASCADE — SITE UTILITIES — PROJECT NO. <br />118-074D (REDA TIF) <br />Ms. Sue Ellen Doudrick, Engineering, advised the Board that on December 11, 2018, bids were <br />received and opened for the above referenced project. After reviewing those bids, Ms. Doudrick <br />recommended that the Board award the contract to the lowest responsive and responsible <br />bidders: <br />a) Indiana Earth, Inc., 10343 McKinley Hwy., Osceola, IN 46561 <br />(1) Amount: $168,472; Divisions A and C <br />b) Ritschard Bros., Inc., 1204 W. Sample St., South Bend, IN 46619 <br />(1) Amount: $51,423.50; Division B <br />Therefore, Ms. Dorau made a motion that the recommendation be accepted and the bid be <br />awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD BID — SMALL DRAINAGE DESIGN AND REPAIR — PROJECT NO. 118-063 <br />(LRSA/SSDA TIF) <br />Ms. Sue Ellen Doudrick, Engineering, advised the Board that on December 11, 2018, bids were <br />received and opened for the above referenced project. After reviewing those bids, Ms. Doudrick <br />recommended that the Board award the contract to the lowest responsive and responsible <br />bidders: <br />a) G.E. Marshall, Inc., 1351 Joliet Rd., Valparaiso, IN 46385 <br />(1) Amount: $135,628; Division A, Hawbaker Street <br />b) Selge Construction Co., Inc., 2833 S. 1 lt" St., Niles, MI 49120 <br />(1) Amount: $104,768.28; Division B, Olivia Circle <br />1 <br />1 <br />