My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/21/1917 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1917
>
08/21/1917 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:17:37 PM
Creation date
1/3/2019 1:16:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/21/1917
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
753 <br />by the Board. <br />W° West. <br />Guarantee bondsfor the followin pavement improvements were approved <br />Pavement on Calvert Street from Miami'Steet to High Street. <br />Asphaltic concrete pavement on Euclid Ave. from,La,Porte Ave. to Lincoln <br />Sheet asi�r alt pavement on Leer Street from Lincoln Way East to Calvert St. <br />Resurfacing with sheet asphalt. La Porte Avenue fro Wash. Ave. to Linden Ave. <br />The Board ordered that the Street Commissioner be not'if ied to put in <br />drain the at the north end of driveway near Fair Association Grounds. Street Com- <br />missioner to- s°ee Mr. Bygene Miller at American Trust Co. <br />Engineer filed assessment roll and final.estimate for. cement sidewalk <br />and grading on west side of Miami Street from alley north of Donald Street to Ewing <br />Avenue, under 'Improvement Resolution No. 533. In the City -of South Bend, Indiana. <br />° <br />°Resolved further, that notices as to the amounts of assessments be <br />published for six consecutive days in the South Bend Dail' Tribune, commencing on the <br />27th° day of August 1917, stating that this Board will''give a hearing on the amount <br />of such assessments Rt its office in the City Hall on the llth° day of September 1917 <br />at 7:45 P.M. ° ° <br />°Resolved further, that the entire Mork under the above contract be accepted <br />and aoproved and the final estimate thereon allowed . Notice of this resolution shall be <br />published on the 27th. day of Au u st 1917 in the South Bend. Daily Tribune, stating that <br />this Board will give a, hearing on the acceptance of .such work a t its office in the City Hall <br />on the llth. day of Se-ptember 1917 at 7:45 P.I. <br />Engineer filed assessment roll fnd final estimate for pip sewers on <br />Carroll Street, Fellows Street, Rush Street and Marietta Struts, from Broadway Street to <br />Indiana Avenue, under Improvement Resolution No. 483. In the City of South Bend., Indiana. <br />_ Resolve-4, _th_at_notices as tthe assessor nts as required by statute be pblished <br />on the �23rd. day of Su,gust 1917 and on the 30th. day of Augst 1917 in the South Bend <br />Daily Tribune, stating that this Board will give a hearing on the amount of such <br />a.ssessmentn at its office in the City Hall on the llth. day of September 1917 at 7:45 P.M. <br />Resolved further9 that the entire work under the above contracts be <br />accepted and approved and the fzUzx!xg entire estimate thereon allowed. Notice of this <br />resolution shall be published on the 23rd. day of August 1917 and ono the30th° day of <br />August 1917 in the South Bend Daily Tribune, stating that this Board will give a. hearing <br />on the acceptance of such work at its office in the City Hall on the llth. dray of <br />September 1917. at 7:45 P.M. <br />Communication received from Deahl and Haminerschmidt in regard to Plumber's <br />bond of Two Thousand Dollars of Joseph B. Fleck, same referred to the Water Department for <br />investigation. <br />Contract for the grading of Campau Street from Arthur Street to the <br />City Limits, was awarded to H. L. Davis for the ar_iount of ...................... . <br />at the prices received at 10:00 A.M. this 21st. day of August 1917, <br />there being no bids received for thepavement of the first alley north <br />of Washington Avenue from William. Street to Taylor Street, the Board ordered that <br />same be read.vertised on the 23rd. day of August 1917 and on the 30th. day of August 1917 <br />in the South Bend Daily Tribune, stating that this Board will received bids for the <br />construction of said work up to 10:00 A.M. on the llth. ay of September 1917. The Board <br />rese nfves the right to reject any and all bids. <br />The Board ordered that the advertising for pipe sewer on Pleasant Street <br />b its should be held up indef initely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.