Beard met in regular session at 10:00 A.M. Mr A. H. Rice absent.
<br />Bids were received, opened and read as follows:
<br />MILTON STREET PAVEMENT,
<br />Bid of The Western Construction Co.
<br />Walk, per ft............... ......................12cents
<br />curbing per lin ft.........4........................23 cents
<br />grading per cu. yd.......................... .....6lcents
<br />Marginal cement curb , per tin ft.,, ,,.. ,. .. 25 cents
<br />Resetting inlets, each..., ........... o..
<br />....... i 01..50
<br />Resetting manholes and covers, each........ ... ,..1.50
<br />Trinidad Sheet Lake Asphalt, per sq. yd..........$1.90
<br />Asphaltic concrete, per sq. yd................... 1.70
<br />8" conduit pipe, per lin ft. ....... o_ ......... * .. .72
<br />Storm water inlets, -,each......7.50
<br />. , Bid of W. B. .BradyCBnstruction Co.
<br />Curbing per lin ft...............................0.27
<br />Grading per cu. yd.................... ........ ...$.64
<br />Storm water inlets, each............ ............8.00
<br />8" conduit pipe, per lin ft.. ... 70
<br />Marginal curb, per lin ft.......................0 .25
<br />Resetting inlets, each ...........................2.00
<br />Resetting manholes and covers, each..............2.00
<br />Trinidad Natural Lake Asphalt, per sq. yd........ 1.90
<br />Asphaltic concrete,, Tribidad asphalt, per sq. yd.1.74
<br />Bid of Williston Construction Company.
<br />Walk, per sq.ft................................:$.15
<br />curbing, per lin ft ......... ........�............. .30
<br />Grading, per cu. yd..,,,,... .............
<br />d............................... .60
<br />8" conduit pipe, per lin ft..... ......... & .65
<br />Storm water inlets, each .........................9.00
<br />?Marginal cement curb, `per 'lin ft................ .25
<br />Resetting inlets, each ....................... . 2.00
<br />Resetting manholes, curbs and covers, each...... 2.00
<br />Aztec asphalt paving, per sq. yt................. 1.82
<br />Asphaltic concrete pavement per sq. yd............ 1.61
<br />All of the above bids were received to the City Eng sneer for tabu-
<br />lation to° be reported on at 7: 45 P.M. this 19th. day of June 1917.
<br />Mr. W. B. Brady, Pres. of the W. B Brady Construction Company
<br />with Mr. K:appis, Met`with the Board in regard to the pavement on Eddy Street and
<br />Mishawaka Avenue from Jefferson Blvd. to Nineteenth Street. Mr. W. B. Brady
<br />informed the Board that he did not think he could put in said contract on last
<br />dears prices. The Board with the Mayor instructed Mr. W. B. Baady of the W. B. Bra#
<br />Construction Company to go ahead and put in said pavement, or if he could not to let
<br />them know definitely Thursday morning June 21st.,1917 at 10:00 A.M. whether or not
<br />he would put pavement in.
<br />The Engineer filed with the board the following partial estimates
<br />for the W. B. Bandy Construction Company on pavement improvements, and the same
<br />were all allowed by the Board.
<br />Partial estimate No. 1 for sheet asphalt pavement on Furbainger St.
<br />from Cottage Grove Avenue to Lincoln -Way West 65% of which amounts to ...... $654.06
<br />Partial estimate No for the sheet asphalt pavement on Calvert
<br />Street from Miami Street to High Street, 65% of which amounts to........... 1,756.10
<br />Partial estimate allowed for the asphalt is concrete pavement on
<br />Pavement improvement on Euclid Avenue from La Porte Avenue to L. W. W, . 4655.47
<br />Partial estimate allowed for the sheet asphalt pavement on Franklin
<br />Street from Indiana Avenue to Calvert St. 65% of which amounts to ......... $8II.20
<br />Partial estimate allowed for the sheet asphalt pavement on Leer Stret
<br />from Lincoln Way East to Calvert St. 65% of which amounts to.00.00090006004845.00