Laserfiche WebLink
Beard met in regular session at 10:00 A.M. Mr A. H. Rice absent. <br />Bids were received, opened and read as follows: <br />MILTON STREET PAVEMENT, <br />Bid of The Western Construction Co. <br />Walk, per ft............... ......................12cents <br />curbing per lin ft.........4........................23 cents <br />grading per cu. yd.......................... .....6lcents <br />Marginal cement curb , per tin ft.,, ,,.. ,. .. 25 cents <br />Resetting inlets, each..., ........... o.. <br />....... i 01..50 <br />Resetting manholes and covers, each........ ... ,..1.50 <br />Trinidad Sheet Lake Asphalt, per sq. yd..........$1.90 <br />Asphaltic concrete, per sq. yd................... 1.70 <br />8" conduit pipe, per lin ft. ....... o_ ......... * .. .72 <br />Storm water inlets, -,each......7.50 <br />. , Bid of W. B. .BradyCBnstruction Co. <br />Curbing per lin ft...............................0.27 <br />Grading per cu. yd.................... ........ ...$.64 <br />Storm water inlets, each............ ............8.00 <br />8" conduit pipe, per lin ft.. ... 70 <br />Marginal curb, per lin ft.......................0 .25 <br />Resetting inlets, each ...........................2.00 <br />Resetting manholes and covers, each..............2.00 <br />Trinidad Natural Lake Asphalt, per sq. yd........ 1.90 <br />Asphaltic concrete,, Tribidad asphalt, per sq. yd.1.74 <br />Bid of Williston Construction Company. <br />Walk, per sq.ft................................:$.15 <br />curbing, per lin ft ......... ........�............. .30 <br />Grading, per cu. yd..,,,,... ............. <br />d............................... .60 <br />8" conduit pipe, per lin ft..... ......... & .65 <br />Storm water inlets, each .........................9.00 <br />?Marginal cement curb, `per 'lin ft................ .25 <br />Resetting inlets, each ....................... . 2.00 <br />Resetting manholes, curbs and covers, each...... 2.00 <br />Aztec asphalt paving, per sq. yt................. 1.82 <br />Asphaltic concrete pavement per sq. yd............ 1.61 <br />All of the above bids were received to the City Eng sneer for tabu- <br />lation to° be reported on at 7: 45 P.M. this 19th. day of June 1917. <br />Mr. W. B. Brady, Pres. of the W. B Brady Construction Company <br />with Mr. K:appis, Met`with the Board in regard to the pavement on Eddy Street and <br />Mishawaka Avenue from Jefferson Blvd. to Nineteenth Street. Mr. W. B. Brady <br />informed the Board that he did not think he could put in said contract on last <br />dears prices. The Board with the Mayor instructed Mr. W. B. Baady of the W. B. Bra# <br />Construction Company to go ahead and put in said pavement, or if he could not to let <br />them know definitely Thursday morning June 21st.,1917 at 10:00 A.M. whether or not <br />he would put pavement in. <br />The Engineer filed with the board the following partial estimates <br />for the W. B. Bandy Construction Company on pavement improvements, and the same <br />were all allowed by the Board. <br />Partial estimate No. 1 for sheet asphalt pavement on Furbainger St. <br />from Cottage Grove Avenue to Lincoln -Way West 65% of which amounts to ...... $654.06 <br />Partial estimate No for the sheet asphalt pavement on Calvert <br />Street from Miami Street to High Street, 65% of which amounts to........... 1,756.10 <br />Partial estimate allowed for the asphalt is concrete pavement on <br />Pavement improvement on Euclid Avenue from La Porte Avenue to L. W. W, . 4655.47 <br />Partial estimate allowed for the sheet asphalt pavement on Franklin <br />Street from Indiana Avenue to Calvert St. 65% of which amounts to ......... $8II.20 <br />Partial estimate allowed for the sheet asphalt pavement on Leer Stret <br />from Lincoln Way East to Calvert St. 65% of which amounts to.00.00090006004845.00 <br />President. <br />